Questionnaire

Transkript

Questionnaire
Questionnaire
Pøepeøská 210
511 24 Turnov
Czech Republic
tel.:
+420 - 481 - 350 195
tel./fax:
+420 - 481 - 350 196
- 322 572
e -mail:
[email protected]
web:
www.markus-trading.cz
Questionnaire
System of plunger up/down control with EPS 215 valves
Machine producer and type: ........................................................................................
Type of machine timing system: ..................................................................................
Please, circle appropriate answers bellow:
sPosition of connector (Pict 3&4):
A
sManometers (Pict.3) on valves (not for A position) are required:
B C D E
Yes
No
sDistribution plates(Pict.4) or air manifold (Pict.5) are requested:
Yes
No
If yes, please send us dimensions replacing red question marks in a drawing No.1
or 2. Check carefully given dimensions.
Note: Pressure air supply piping (G 2") for the air manifold delivered by Markus
Trading will be made by the customer
sHand of a control panel (Pict.8) and its height from the floor:
LH
RH
sBuilt-in panel (Pict.9&10), please specify space available in uprights (mm):
width (min. 200) ...............
height .................
depth ................
sManual plunger up/down switch position for each cavity:
s In overhead blank side panel - are there any blinded holes? Their diameter..........
s Other position - please, send a sketch or photo with dimensions
sLength of cables in m (Drawing No.831 112):
sManual override
.................
sTrigger signals
.................
sSerial line Rs485
.................
sEP valves
.................
Description
Membrane
Assembly
Effective cross section
Weight
Sealing material
Hysteresis
Repeatability
Sensitivity
Response time
Working medium
Air and environment temperature
Range of input pressure
Adjustable pressure
Starting signal
Power supply
Electric connection
Software
Membrane pressure regulator with control
VITON
Distributing plate - 4 x M6; input/output G 3/4"
2
160 mm
1.5 kg
VITON
1 kP
1 kP
1 kP
20 ms
Dry, filtered, not oily pressure air
O
0 to 60 C
0.1 to 0.9 Mpa
0.005 - input pressure Mpa
0/24 V DC
24 V
Round connector CONTACT
P.P.C., RS 485
Picture 1
128
98
70
2
152
A
40
G 3/4"
45
G 3/4"
Vzduchový
kanál
Input from
air manifold
90
max. 140
G 3/4" -Výstup vzduchu z mechanizmu
Exhausting air from mechanism
40
(80)
C
Vzduch do mechanizmu
Output to plunger mechanism
32
Picture 2
A
40
(48)
B
128
D
Picture 3
E
Picture 4
Existing machine platform
Deska pro stroje Emhart
Plate for Emhart machines
G 3/4"
G 3/4"
Pùvodní vzduchový kanál
Original air manifold
Picture 5
Existing machine platform
Vzduchový kanál min.80 x 80 mm
Air manifold min. 80 x 80 mm
G 3/4"
G 3/4"
Drawing No.1
20
DISTRIBUTION PLATE
200
100
120
170
?
Drawing No.2
AIR MANIFOLD
?
?
?
?
?
Minimální prostor pro výmìnu ventilu shora
Minimum area for valve exchange from above
min. 220
min. 200
?
Picture 8
STANDARD
Hloubka panelu = 255 mm
Depth of panel = 255 mm
700
Boènice stroje
Machine upright
500
80
Ovládací panel ventilù pro 6-ti a 8-mi sekèní stroj-levý (pravý-zrcadlový obraz)
Control panel for valves for IS6 to IS 8 m/c - LH (RH oposit)
Pro 10-ti a vícesekèní stroj musí být panely dva (levý a pravý)
For IS10 and more there must be two panels (LH+RH)
Picture 9
OPTION
Picture 10
Pøíklady integrace ovládání ventilù do boènic dle potøeb zákazníka
Samples of build in panels regarding customer's need
Picture 6
Ventil v plošinì - nový stroj
Valve in m/c platform - new m/c
Picture 7
Ventil v plošinì - modernizace staršího stroje
Valve in m/c platform - modernisation of existing m/c

Podobné dokumenty

PNT800L-PC

PNT800L-PC 2. NEPROVÁDĚJTE žádné úpravy na nástroji. Případné úpravy nástroje budou mít za následek neplatnost všech aplikovatelných záruk a mohou vést k poškození nástroje nebo poranění uživatele. 3. Odpojte...

Více

PNT800A - JK Schrauben

PNT800A - JK Schrauben neplatnost všech aplikovatelných záruk a mohou vést k poškození nástroje nebo poranění uživatele. 3. Odpojte přívod vzduchu při nastavování, údržbě nebo odstraňování některé části nástroje. 4. Opra...

Více

Doporučený postup na sestavení SGV

Doporučený postup na sestavení SGV 3. Høídel s pružinou 4. Hor. Vedení + C profil 5. Motor + dráha motoru 6. Ocelové lanka 7. Panely 8. Nastavitelná pásovina

Více

tepelná čerpadla fairland

tepelná čerpadla fairland Tepelná čerpadla FAIRLAND zajišťují oproti tradičním metodám vyhřívání bazénů značné energetické úspory. Využívají tepelnou energii získávanou z okolního vzduchu a pomocí výměníku v tepelném čerpa...

Více

interior set - KPM Bratislava

interior set - KPM Bratislava Díly ohnuté popø. pokroucené vlivem teplotních zmìn a stárnutí materiálu, mohou být narovnány do požadovaného tvaru pomocí proudu teplé vody nebo vzduchu (fén na vlasy). Parts slightly distorted an...

Více

zde (pdf - 3,9 MB)

zde (pdf - 3,9 MB) 45 minutes test at the production line plus next 3 % of all produced heat pumps go thru long therm test. Heat pums FAIRLAND are not only sawing your money but also the enviroment, because more than...

Více

SGV 04 SL -připravenost pro sekční garážová vrata

SGV 04 SL -připravenost pro sekční garážová vrata Stavební pøipravenost: následující schéma øešení a kabeláe je pouze orientaèní veškeré rozmìry a typy pouitých kabelù Vám sdìlí naši obchodní zástupci pøímo u Vás v místì montáe - tuto slubu Vá...

Více