introduction services company orders activities awards

Transkript

introduction services company orders activities awards
introduction
services
company
company
profile
orders
activities
awards
contact
The Plzeňská
street bridging
and the Mrázovka
tunnel (Prague)
CO N TAC T
BUSINESS NAME:
ADDRESS:
PHONE:
FAX:
ID.NO:
Sokolská 32, 120 00 Praha 2 – Nové Město,
Czech Republic
+420 296 337 111
+420 296 337 100
EMAIL:
WEB:
SATRA, spol. s r. o.
[email protected]
www.satra.cz
18584209
TAX ID. NO:
CZ18584209
LEGAL FORM:
Limited liability Company, registered in the
Business Register on 17.7.1991; the Company is registered in
the Business register at the Register Court in Prague, Part C,
Entry 3014
introduction
The SATRA, spol. s r.o. offers complex design, consulting, engineering and architectonic services, from investment projects
to approval and evaluation of trial operation of civil, industrial
and engineering structures. For more than 20 years, our opinion is that high-quality work always requires perfect technical
equipment, skilled professionals with extensive theoretical
knowledge, who are interested in their relevant specialization,
and adequate working environment.
We fulfill the basic vision of our Company every day: our work
target is a high-quality result. Our initiative and effort is focused
on this target for the whole time of its realization. Therefore,
when realizing our orders, we make an effort to ensure active
approach, above the framework of our contractual obligations.
We always provide the most complex services possible, with
emphasis on high quality level. Every order, regardless of its
scope or attractiveness, represents for us something more than
a business case only; we perceive our work as an obligation necessary for successful completion of the relevant construction.
We are convinced that only the quality of the services provided, without any attributes, will satisfy our business partners
and customers. Therefore, we apply a process control method
when we evaluate continuously efficiency of all processes, in
particular the control processes. After all, it is always our work
that speaks for us and that is our credit. It is always complex
work, from the order acceptance to putting the entire construction into operation. Consistent monitoring of every detail
and effort to offer our clients maximum quality and precise
services – this was, is and will be our specific feature.
We are the users of our constructions, therefore every detail
is important to us. We are looking for environment-friendly
solutions that serve their purpose efficiently. Our work helps
creating the world in which we live.
However, we are not designers and consultants only; research
and publishing activities are an indispensable part of our work.
We publish specialized books, we contribute to well-known
professional periodicals, and we produce audio-visual works
and operate internet portals. We are engaged in research in
the area of building structures and technologies, fire ventilation or traffic safety in vehicular tunnels. We are active members
of several national and international professional associations.
You are holding in your hand the profile of our Company with
more than two decades of successful existence. Within this
time period, we have worked for several tens of clients. We
have brought to life hundreds of various projects. It is impossible to list all of them, neither is it possible to specify completely all the services offered. Our ambition is to introduce the
best of our work within the past twenty years of which we can
be rightfully proud.
D. I. Ludvík Šajtar
Managing director and CEO
1
services
The PANASONIC
TV production
plant (Plzeň
Region)
Services offered
❚
Design and architectonic services
❚
Consulting services
❚
Transportation structures
❚
Monitoring of constructions
❚
Engineering structures and constructions
❚
Engineering and mandatory activities
❚
Bridges and footbridges
❚
Commercial and advertising services
❚
❚
Tunnels, underground structures, special foundations,
geotechnical works
Research activities and preparation
of technical regulations
❚
Civil, administrative and commercial structures
❚
Production and industrial structures
❚
Special purpose structures
❚
Water management and landscaping engineering
structures
❚
Urban infrastructure
❚
Underground services
❚
Technologic complexes, installations
❚
Fire safety of structures
❚
Ventilation and industrial HVAC, operational
and fire ventilation HVAC
❚
Diagnostics of structures, structures security,
failures monitoring
❚
Prevention of risks and consultations in the area
of Work Safety and Health Protection at Work,
fire protection and ecology
❚
Landscape planning
S P E C I A L I Z AT I O N A N O R I E N TAT I O N
C O M P I L E D D O C U M E N TAT I O N
OTHER SERVICES
2
S P E C I A L I Z AT I O N A N O R I E N TAT I O N
CEMS ČZÚ
in Prague (Prague)
Blanka tunnel
complex (Prague)
3D static calculation
The Ruzyně airport,
terminal North 2
(Prague)
C O M P I L E D D O C U M E N TAT I O N
OTHER SERVICES
❚
Search, verification, technical, urbanistic,
traffic and other studies
❚
Coordination of extensive building projects,
realization of building and technical supervision
❚
Economic, environmental and risk analyses
❚
❚
Documentation for zoning and planning decisions
and for building permits
Complete ensuring of engineering and mandatory
services, from the design and permits ensuring to
approval and putting it into operation/commissioning
❚
Safety documentation
❚
❚
Documentation for contractors selection
Complete ensuring of geodetic works, including
a responsible geodesist´s work
❚
Detailed and shop documentation
❚
❚
As-is documentation
Complete ensuring of engineering – geological, hydro
geologic surveys of constructions
❚
Operational-technical information systems
of structures
❚
Structural-technical surveys of constructions
❚
❚
Working regulations
Control and monitoring ensuring at constructions
realization
❚
Survey of structures and surveying of buildings,
reconstruction documentation
❚
Technical supervision at the construction
❚
Main inspection of tunnel structures
❚
Safety audits
❚
PR support of designs and presentation of structures
❚
Traffic-engineering measures
❚
Preparation of information materials
❚
Supervision of projects, economic analyses an
estimates
❚
Visualization
❚
Equipment for information centers
Photographic documentation
❚
Expert opinions, static calculations and expertises
❚
❚
Architectonic and urbanistic designs
❚
Aerial photography
❚
Audiovisual presentation, sketches in photographs,
axonometric models
❚
Preparation and administration of internet pages
3
services
Concept of the
North-South
arterial road
traffic reduction
(Prague)
Design and architectonic
services
In cooperation with prominent Czech and foreign architects,
we provide the best-quality services in the areas of technical
designing and architectonic solutions. The design preparation
of constructions is divided into the following main stages and
following activities.
❚
❚
❚
4
Pre-design preparation of constructions that includes
studies (urbanistic, architectonic, verifying, buildup, volume, operational and interior) and economic
analyses and tests (calculation of investment and
operating costs, specification of economic risks, profits
and gains);
Documentation attached to the application for
decision concerning the construction location (DÚR)
Documentation attached to the application for
building, traffic or water management permits of the
construction (DSP)
❚
Documentation for tenders for the construction
contractor, design input data, bill of quantities, data
specification for the constructions (ZDS)
❚
Documentation for the construction realization (RD)
❚
Author supervision over the construction preparation
and realization
❚
Interiors design documentation
❚
Calculation of investment an operating costs of the
construction
❚
Itemized budgets of the construction investment
costs
❚
Documentation of the as-is construction realization
(DSPS)
❚
Documentation of the construction trial operation
(tests plan and content)
❚
Operating documentation (handling and operating
instructions, regulations and other)
Measuring of the
Panenská tunnel
lining effect on the
D8 highway (Ústí
Region)
Consulting
services
SATRA provides complex services in the area of consulting.
Only owing to the long-lasting tradition of our Company and
to its good name in this field, we are sought by domestic, as
well as by foreign partners.
Our specialists draw their knowledge not only from their
university education and high-quality practice, but also from
their participation in international professional conferences,
where they also present their knowledge and pass it
further. Our specialists have worked on tens of complicated
projects and research tasks. They present their experience in
professional publications and journals, they are nominated
regularly to scientific and preparatory committees of
international symposia and conferences; they also lecture
on universities. All the employees are motivated actively to
upgrade their qualification and deepen their professional
knowledge continuously.
Owing to all this, SATRA is now one of the strongest consulting
companies in the Czech Republic.
5
services
Engineering and mandatory
activities
SATRA provides complex services in the area of engineering
and mandatory activities. Owing to its attorneys’ experience, it
ensures property rights settlements, including expropriating
proceedings for the purposes of transportation structures
constructing.
Complex services for promoters include:
❚ the requirements and ideas consulting with the
promoter
❚ order analyses, reconnaissance of the building site,
specification of input data and surveys. Checking
the building site and its neighborhood status and
conditions;
❚ participation in the building site selection, explanation
of technical principles an conditions for design and
engineering preparation of the construction;
❚ approval of the targets with the promoter;
❚ ensuring of the required data from geodetic survey,
from technical, historical and geological researches,
data for documentation of the construction impact
on the environment, structural – technical analyses of
structures, etc. ;
❚ economic analyses of the order;
❚ organization and management of the design and
engineering preparation of the construction, including
appointment of professionally skilled and technically
efficient team of experts;
❚ public law negotiation of the documentation and
obtaining of the required permits for the construction;
❚ organization and preparation of tenders (public
contracts) for the construction contractor, including
contractual relations;
❚ the promoter´s representation in all activities related to
the construction preparation and realization, including
realization of the construction technical supervision;
❚ ensuring of takeovers, acceptances and approval
processes
6
Engineering services include the following activities:
❚ coordination of processes of evaluating the impacts
on the environment EIA
❚ consulting the documentation for the construction
land proceedings (DÚR) with the relevant authorities,
organizations and other participants, for the purpose
of a planning decision issuing
❚ preparation of a design for the land proceedings
initiation and ensuring of the planning decision
(decision regarding the construction location)
❚ consultations of documentation for the building
proceedings (DSP) with the relevant authorities,
organizations and other participants, for the purpose
of a building permit issuing
❚ preparation of a plan for the building proceedings
initiation and ensuring of building permits issuing;
❚ organizational ensuring of cooperation at a tender
for the Construction contractor
❚ cooperation at the Construction specification
for the Contractor (or Contractors), i.e. preparation
of contracts, etc.
❚ cooperation at coordination of works and deliveries by
direct suppliers (the provider, according to this article
of the Contract, does not realize the construction
technical supervision activities)
❚ organization of the approval procedure and ensuring
of the approval decision issuing
❚ technical supervision realization
❚ construction supervision
REFERENCE ORDERS
❚
❚
❚
❚
The Czech Broadcasting Company building
reconstruction (Prague)
Multifunctional operating center Malovanka
The Urban Ring and the Libeňská connection
constructions complex (Prague)
Completion of the Capital of Prague Archive (Prague)
Safety
documentation
The safety documentation evaluates the tunnel safety level
and specifies preventive and safety measures required for
ensuring of the necessary safety levels of the tunnel users.
The safety documentation is compiled in the scope specified
by the Government Decree No. 264/2009 Sb. and by the Edict
of the European Parliament and Council 2004/54/ES, On
minimum safety requirements on tunnels – TERN. It includes all
the structural – technologic and operational – organizational
information important for operation safety:
❚ description of the construction planned and of its
surroundings
❚ basic information on the method of the tunnel
management and control
❚ available information on the existing or expected
future traffic intensity
❚ assessment and evaluation of the tunnel infrastructure
safety level
❚ danger identification – risks analyses methods
❚ description and evaluation of emergencies risks,
including emergencies concerning dangerous cargoes
❚ recommended measures for tunnel infrastructures
modification
❚ recommended organizational measures
❚ method and procedure of emergencies solution
❚ safety expertise
❚ system of emergencies evaluation
❚ specification of regular safety inspections intervals
❚ list of trainings realized
❚ professional statements of authorized engineers from
the area of fire safety of buildings and transportation
structures in connection with general safety of the
tunnel
Selected methods of risks analysis:
❚ method of risks estimate/evaluation (risk matrix)
❚ analysis of a relevant fire scenario in the tunnel –
a model of smoke development in dependence on the
burning vehicle position in the tunnel, a simplified
model of the tunnel users evacuation; a draft
of optional ventilation reconstruction in dependence
on the fire scenarios evaluation.
❚ quantitative risk analysis of dangerous cargo
transportation through a tunnel, using SW QRAM,
in the tunnel category according to ADR, analysis
of the traffic diversion issue.
❚ probabilistic Risk Assessment (PRA) –qualitative
evaluation of the existing and planned equipment
of the operated tunnel that allows comparison
of individual designs variants from the viewpoint
of safety level in relation to the investment and
operating costs of individual variants
The safety documentation is a live controlled document that
accompanies a vehicular tunnel in all stages of its construction
lifetime stages. It is compiled within the designing stage and,
subsequently, it is maintained and updated for the time of the
structure operation.
REFERENCE ORDERS
❚
❚
❚
❚
❚
❚
❚
Highway D8, tunnel Panenská (Ústí Region)
Highway D8, tunnel Libouchec (Ústí Region)
Highway D2, tunnel Sitina (Slovak Republic)
Highway D1, tunnel Klimkovice (Moravian-Silesian
Region)
Urban Ring, tunnel Blanka (Prague)
Urban Ring, Strahovský vehicular tunnel (Prague)
Radlická arterial road, tunnel Radlice (Prague)
7
services
Structures
monitored at the
Mrázovka tunnel
driveage (Prague)
Monitoring of structures
and survey of structures
The so-called monitoring is not only an integral part of
constructions realized by the mining method (e.g. driven
tunnels), but now also of many other extensive constructions
which influence their surroundings. The monitoring consists of
measuring and monitoring the construction realized proper,
and also of structures and their surroundings influenced
by the construction and building activities. In particular, it
concerns impacts caused by the terrain lowering, changed
hydro geologic conditions, seismic effects from blasting works
and building machinery, etc. In particular, deformations,
inclinations, drop faults, deformations occurrence and
development or also noise loading.
The monitoring must also include survey of passports of
the monitored structures in order to determine their real
condition before and after the construction realization. This is
the only way how to prevent potential property right disputes.
Survey of structure, in other words documenting of the as-is
condition of a structure, is also used in other situations than
in case of impacts caused by building works. It is also a part of
the contractual relation concerning lease or sale of a structure,
for the needs of reconstructions, etc.
8
Owing to our working team´s experience, we provide complex
services in the area of monitoring and survey of structure of
buildings. We ensure the entire process, from the solution draft,
the measuring and monitoring deliveries proper, including the
survey of structure compilation, to final evaluation of repair
plans till completion of the whole construction.
Also in this area our specialists apply their experience,
obtained from active participation in research projects in the
area of building structures or tunnel linings monitoring and
evaluation.
Example of defects
recording in the
survey of structures
Automatic
dilatometer on
a wall crack
Damaged ceiling
structure
REFERENCE ORDERS
❚
Urban Ring, Mrázovka tunnel (Prague)
❚
Urban Ring, Blanka tunnel complex (Prague)
❚
Highway D5, tunnel Valík (Plzeň Region)
❚
Anti-noise prevention in developments (Prague)
9
services
The Těšnovský
tunnel (Prague)
Main inspections
of tunnel structures
Main inspections of tunnel structures include:
❚
The main inspection documentation includes:
inspection of the structural – technical condition of
all structures (tunnel tubes, interconnections, portal
and surface parts, technologic structures, technical
corridors, etc.)
❚
general assessment of the structural and technologic
parts condition
❚
description and photographic documentation
of established defects or failures
❚
inspection including performance of tests of
emergency operation modes of the technologic part
of the tunnel ;
❚
checking of operation and registration sheets
(inspections)
❚
❚
inspection records realization
all the tunnel structure parts are inspected from the
viewpoint of their structural – technical condition,
functionality, operating reliability and operation safety
❚
evaluation of geotechnical monitoring for the past
time period
❚
draft of further procedure at troubleshooting
and defects removal
❚
recommendation for the next inspection
❚
evaluation of the condition with regard
to the preceding inspection
❚
qualification of the tunnel general condition
according to TP 154
The tunnel inspection and testing is realized, in particular,
during scheduled night shutdowns specified by the tunnel
administrator because of its cleaning and maintenance.
The main inspections are realized in compliance with
requirements of regulations in force.
10
Main inspections
of tunnel
structures
(Prague)
REFERENCE ORDERS
❚
Vyšehradský tunnel (Prague)
❚
Těšnovský vehicular tunnel (Prague)
❚
Tunnel for pedestrians Žižkov-Karlín (Prague)
❚
Letenský vehicular tunnel (Prague)
❚
Zlíchovský vehicular tunnel (Prague)
11
services
Visualization
of the new
Myslbekova Park
(Prague)
PR support of designs
and visualizations
creation
When working on major construction projects, there exist
many auxiliary activities required for support of trouble free
course of the investor and design preparation, as well as of the
construction proper. For example, it concerns the following:
12
❚
visualization of constructions
❚
information materials preparation
❚
preparation and operation of information web portals
❚
elaboration of presentation materials in printed and
electronic forms
❚
ensuring of information centers content
❚
ensuring of photographic documentation
When ensuring projects support, we cooperate with a timetested creative team. Owing to this fact, we are able to ensure
high quality of all the activities. It can be proven by several
awards obtained in domestic and international competitions.
The Radlická
radial (Prague)
The Zlíchovký
tunnel (Prague)
The Letenský
tunnel (Prague)
Completion
of the Královský
pivovar Krušovice
Brewery (Central
Region)
REFERENCE ORDERS
❚
Urban Ring, Mrázovka tunnel (Prague)
❚
Reconstruction of the Ministry of Defense buildings
(Prague)
❚
Orders for the CR Ministry of Defense
❚
The Královský pivovar Krušovice brewery (Central
Region)
❚
Urban Ring, tunnel complex Blanka (Prague)
❚
Main inspections of tunnel structures (Prague)
❚
The North-south arterial road traffic reduction
(Prague)
❚
Multifunctional operational center Malovanka
(Prague)
❚
The Urban Ring eastern part and the Libeňská
connection (Prague)
❚
Radlická arterial road (Prague)
13
company
THE COMPANY HISTORY
The SATRA Company has arisen from the sixth atelier of the
Military Design Institute in Prague in the year 1991. Regarding
continuity of the original specialization of individual
employees, emphasis has been put on constructions with
high technology ratio and on underground structures. Within
its more than twenty-year-old history, the SATRA Company
has realized orders for major domestic and foreign investors,
in particular for the state administration and urban selfgovernment authorities. In the long run, the most important
clients are the Capital of Prague and the Czech Republic
Ministry of Defense.
The Company participates significantly in preparation and
realization of the Prague superior road system. It acted as
the coordinator of the construction and technologic part
at completion and gradual putting into operation of the
Strahovský vehicular tunnel, then as the designer of the
driven parts and technologic equipment of the Mrázovka
tunnels. At the present time, it is the coordinator of the design
D. I. Ludvík
Šajtar and
D. I. Josef Dvořák
established the
SATRA, spol. s r.o.
Company.
Opening the
Kotva arcade at
the homonymous
department store
in Prague.
The first designs
of the Strahovský
vehicular tunnel
operating
systems are being
prepared.
preparation and the designer of the Urban Ring in the
Malovanka – Pelc-Tyrolka section, of the Blanka tunnel
complex. It participates in designs of the east part of the
Urban Ring and the Libeňská connection, of the Radlická
arterial road and of other significant transport routes – not
only in the Capital.
However, the spectrum of the SATRA Company references
within the past twenty years is much wider. Just an example
– the PANASONIC factory in Pilsen, general reconstruction of
the Czech Broadcasting Company, reconstruction of the Army
General Headquarters building in Prague and completion of
the Capital of Prague Archive. The orders portfolio includes also
special constructions, e.g. the Prague collectors, construction
of the ČNB standby center, many orders for the Defense
department, a new Multifunctional Center Malovanka or
elaboration of safety documentation for majority of vehicular
tunnels in the Czech Republic.
Design
Documentation
of the Prunéřov II
Power Plant
desulphurization.
Kick off of works
on the project
concerning
reconstruction of
the U Sixtů hotel
in the Prague
Old Town region.
Construction on
the Matsushita
factory for
production of the
PANASONIC TV
in Pilsen.
1991 1992 1993 1994 1995 1996
14
C E R T I F I C AT I O N
The Company owns certificates according to the ČSN EN ISO
9001, ČSN EN ISO 14001 and ČSN OHSAS 18001 standards.
The Quality control system has been certified in the firm since
the year 1999; this certified system ensures observance of
qualitative standards at providing of services in the area of
design and engineering activities. A process approach with
intensive orientation on the customer is applied within this
system. The system is maintained continuously and it is recertified every three years – the last time in December 2011.
The environmental control systems ČSN EN ISO 14001 and
work safety systems ČSN OHSAS 18001 have also been certified since December 2011.
Reconstruction
of the Český
Telecom Central
Computing Center
(Telefónica Czech
Republic, a.s.
now).
The Biological
evaluation of
the Královská
obora and
Jabloňka natural
sanctuaries was
elaborated.
The Strahovský
vehicular tunnel
in Prague is put
into operation.
Kick off
of the Anděl
Multi-cinema
in Smíchov.
As of November 2001, the SATRA Company is the owner of the
National Security Bureau for confidentiality level “Confidential”. Selected specialists are accredited to be acquainted with
and to work with classified facts to the confidentiality level D
(„Confidential“).
The Příkopy
collector in the
section Panská –
Václavské square
completed.
Geotechnical
monitoring and
control of the
Blanka tunnel
exploratory
gallery driveage.
1997 1998 1999 2000 2001 2002
15
company
WORKING TEAM
❚
The SATRA Company employees have a high level
of professional education, specialization and
qualification in the relevant field.
❚
More than 60 % of employees own special
authorizations and certifications, including the ČKAIT
authorization in a wide specter of specializations.
❚
Average practice in the relevant specialization
is 20 years.
❚
❚
More than 50 % of employees have university
education.
The Company motivates its employees to improve
continuously their qualification and to deepen their
professional knowledge.
The study of
the Urban Ring
tunnel structures
operation safety is
being elaborated.
The Mrázovka tunnels in the Prague
Urban Ring are put into operation.
2003 2004
16
Area management
of the Královský
pivovar Krušovice
brewery project
completion.
The Czech
National Bank
standby center put
into operation.
The Blanka
tunnel complex
construction
started in the
Letná and Troja
building sites.
2005 2006 2007
O R G A N I Z AT I O N A L S T R U C T U R E
I N G . LU D V Í K Š A J TA R
Managing director and CEO
PAV E L K N O R
ING. ALEXANDR BUTOVIČ, PHD.
I N G. PAV E L Š O U R E K
Business manager
Production manager
Technical manager
C O N S T R U C T I O N A N D S TAT I C S
CIVIL ENGINEERING
Ing. Vladimír Petržílka, leader of WG
Ing. Petr Tětek, leader of WG
TRAFFIC ENGINEERING
GEOTECHNICS
Ing. František Polák, leader of WG
Ing. František Červenka, leader of WG
TECHNOLOGY
ECONOMY OF CONSTRUCTION
Ing. Petr Bednář, leader of WG
Marek Jansa, leader of WG
The study of
traffic reduction
of the North-south
artery road at the
National Museum
is completed.
The biggest scope
of construction
works on surface
building sites of
the Blanka tunnel
complex.
The EIA documentation of the east part
of the Urban Ring and the Libeňská
connection completed.
2008 2009 2010
The
Multifunctional
operating center
Malovanka design
preparation.
First assemblies
of the Blanka
tunnel complex
technologic
equipment.
2011 2012
17
orders
The Mrázovka
tunnel (Prague)
MRÁZOVKA TUNNELS
The Mrázovka tunnels are a part of the Urban Ring in the
territory of the fifth Prague district. They consist of two threeline tunnels which split in forks into two-line tunnels in the
Urban Ring route and into single-line branches in the Radlická
street. The tunnels driveage proceeded in complicated
geologic conditions, in shallow depths under the Smíchov
development. Within the driveage course, the so-called
observation method has been applied in the Czech Republic
for the first time, including a monitoring system, designed by
the SATRA Company. Knowledge obtained from the Study
of the tunnel structures operation safety, elaborated by our
Company in the year 2003, has been implemented in the final
design of the tunnel interior. The Mrázovka tunnels represent
a high safety standard according to the all-European standard
also owing to the above concept. The construction has
resulted in significant improvement of the traffic and emission
situation in the entire Smíchov territory.
Activities realized
❚
DÚR
❚
DSP
❚
RD of the exploration gallery
❚
RD of the driven tunnels
❚
RD of the whole construction technology
❚
documentation of the surface built-up area securing
❚
design documentation of monitoring at driveage
❚
as-is documentation
❚
operating documentation and operating regulations
of the tunnel
❚
documentation of measuring and monitoring
at operation
❚
author supervision
❚
visualizations preparation
Investor
The Capital of Prague
Year
1998−2012
Location
Prague 5 – Smíchov
18
The Hněvkovský II
tunnel (Olomouc
Region)
O P T I M I Z AT I O N O F T H E R A I LW AY C O R R I D O R
AT Z Á B Ř E H N A M O R AV Ě
Construction of three new tunnels with the total length of
966 m, reconstruction of seventeen existing tunnels and
construction of six new bridges was also a part of optimization
of the 2nd and 3rd railway corridor between Zábřeh na Moravě
and Krasíkov. Rectification of the railroad track was necessary
in order to allow the railway speed increase to 160 km/h. The
order was financed within the ISPA program. The general
technical and financial management of the construction
proceeded in compliance with the EU regulations and with the
FIDIC contractual conditions. The SATRA Company supervised
the tunnel sections. The supervision goal was to make sure
that the construction works are realized within the Design
Documentation scope, within the time period specified,
within the approved investment costs and in compliance with
the technical parameters specified in the Contract.
Activities realized
❚
quality control of the construction works and ensuring
of their compliance with the relevant standards and
regulations
❚
inspection of the established real scope of works and
of compliance with the establishing records/protocols
of the Contractor
❚
monitoring of the change proceedings status and
of the asserted demands justification
❚
inspection of the establishing records/protocols
of the Contractor
❚
participation in the completed works acceptance,
in commission inquiries and in approval procedures
❚
participation in technical – safety tests and in check
tests
Investor
Ministry of Transport of the Czech Republic
Year
2004–2007
Location
Pardubice Region; Olomouc Region
19
orders
Construction
of the Blanka
tunnel in Letná
(Prague)
BLANKA TUNNEL COMPLEX
The Blanka tunnel complex is divided into four separate
constructions, the design preparation of which has always
proceeded simultaneously and was therefore coordinated so
that the entire complex of constructions were one functional
whole. The route passes under urbanized environment on
the boundaries of the historical Prague center; it is routed in
driven and cut-and-cover tunnels, with connection ramps
in important junctions. It is one of the most complicated
constructions that have ever existed in Prague, not only with
regard to the transportation structure proper, but alsodue
to the number of necessary relocations of buried services
or traffic measures during the construction. Such demands
scope is comparable probably with the first operating subway
sections only. The total length of the tunnel complex is 5,5 km,
from that the driven sections measure almost 3 kilometers.
The ventilation machine room under Letná represents one of
the biggest driven spaces in the Czech Republic.
Activities realized
20
❚
Verification studies
❚
DÚR
❚
DSP
❚
coordination documentation of the constructions
complex
❚
buried services coordination
❚
the structural part and technology realization
documentation
❚
survey of structures of the surface built-up area
buildings
❚
biological evaluation of the Královská obora
and Jabloňka nature monuments
❚
pre-investment study of the structures complex for EIB
❚
study of the Urban Ring tunnel structures operation
safety
❚
author supervision
❚
safety documentation of the tunnel
❚
visualizations preparation, ensuring of PR activities,
including the web portal
Investor
The Capital of Prague
Year
1999−ongoing
Location
Prague 6; Prague 7; Prague 8; Prague-Troja
The Castle
complex in Valtice
(South-Moravian
Region)
T H E V A LT I C E B A R O Q U E C A S T L E T H E AT E R
The Lednicko-Valtická area belongs among the largest parks
in Europe that have ever been completed by human hand. In
the year 1992 it has been declared a protected landscape area
and in December 1996 it has been registered in the UNESCO
List of World Cultural and Natural Heritage. It also includes the
Valtice castle complex. The order subject is renovation and
reconstruction of the original baroque theatre in the castle
complex so that it would become a part of the National Theater
and dance center. The theatre building forms a separate wing,
jutting perpendicularly in the south-east direction from
the castle corner and from the castle moat to the park. The
building will be utilized according to its original purpose as
a baroque castle theater for 240 spectators and 60 actors. The
theater proper will be located in the original theatre wing; the
background for guests and actors will reach into the adjacent
castle areas and into the former pressing shop interior.
Activities realized
❚
surveys
❚
DSP
❚
engineering activities
❚
author and technical supervision
❚
realization documentation
❚
design documentation of interiors
Investor
National Heritage Institute
Year
2012− ongoing
Location
Valtice, South Moravian Region
21
orders
The Příkopy
Collector (Prague)
PRAGUE COLLECTORS
Construction of collectors for routing of pipe and cable buried
services in the Prague center, in the section of Václavské square
– Obecní dům. When routed in the collectors, the buried
services are accessible for continuous inspections, repairs
and maintenance. Potential defects are removed directly in
the collectors, without roads disturbance, i.e. without any
traffic restrictions. The driven collectors are being constructed
directly under the historical built-up area. The Prague
collectors under the historical center of the City are not only
a functional structure, but also a phenomenon that attracts
professionals and well as lay enthusiasts. The collector section
Centrum and Příkopy is a part of an attractive sightseeing
route for the public.
Activities realized
❚
APOK studies (Autonomous service route Příkopy)
❚
DÚR
❚
DSP
❚
author supervision
❚
realization documentation of the structural past
in the section Panská – Václavské square
Investor
The Capital of Prague
Year
1997−2000
Location
Prague 1
22
The Lajanuri
waterworks
(Georgia)
T H E L A J A N U R I WAT E R W O R K S
The Lajanuri hydroelectric power station with three generators
with the output of 113 megawatts was commissioned in the
year 1960. It is locate east of Tsangeri in the west Georgia. This
order subject was to elaborate a plan of its repair technical
solution and reconstruction of the most damaged sections
of the gravity supply line that supplies water from the
Tskhenistkali river to the Lajanuri dam. The supply line tunnel
is constructed as a reinforced concrete circular profile; then it is
circular, from steel tubbing with partial concreting of the walls.
The design flow rate through the tunnel is 60 m3 per second.
Activities realized
❚
technical design draft
❚
geologic survey supervision
❚
geodetic survey
❚
elaboration of the tunnel damage documentation
❚
single-level design documentation
❚
itemized budget
❚
author supervision
Investor
ENERGO-PRO s.r.o.
Year
2012
Location
Georgia
23
orders
The Army House
on the Vítězné
square (Prague)
RECONSTRUCTION OF THE ČR MINISTRY
OF DEFENSE BUILDINGS
Reconstruction of the ČR Ministry of Defense buildings on
the Vítězné square in Dejvice was split into three stages that
include reconstruction of the Prague Army House building,
the ČR Army General HQ and driveage of an interconnecting
tunnel between the buildings under the Buzulucká street. The
general reconstruction of the Prague Army House building
includes the building reconstruction so as to provide a hotel
for the Ministry of Defense and the ČR Army.
Activities realized
❚
studies
❚
visualizations preparation
❚
DÚR
❚
DSP
❚
engineering activities
❚
author supervision
❚
realization documentation
Investor
Ministry of Defense of the Czech Republic
Year
2006−2009
Location
Prague 6
24
Study of the
North-South
arterial road
traffic reduction
(Prague)
REDUCTION OF THE NORTHSOUTH
ARTERIAL ROAD TRAFFIC
At the present time, the North-South arterial road is one
of the busiest highways of the Capital of Prague, with all
its negative and positive aspects of such a transportation
structure which influence the City life. The situation is the
more serious because the arterial road is routed crosswise the
City center proper and it reaches the margin of the UNESCOprotected Prague monument reserve. Within the past years,
its section at the national Museum – however, not only here
– has become one of the most problematic traffic locations in
the very heart of Prague. In its entire length, the arterial road
degrades significantly the urban surroundings, worsens its
habitableness as well as the recreational potential of adjacent
park areas and degrades the urban significance. The City life
and the urban functions in its vicinity stagnate in fact. The
studies target was to design such solutions that would be in
compliance with the conditions of permanently sustainable
Capital development, improve the environmental conditions
not only in the inside area of the Urban Ring, allow new
urbanistic incorporation of this highway into the City, remove
the urbanistic an space barriers and allow rehabilitation of the
non-urban areas and unsuitable solutions in the arterial road
neighborhood.
Activities realized
❚
studies of the national Museum surroundings
reconstruction
❚
studies of the Rumunská – Bolzanova section
❚
study of the North south arterial road traffic reduction
concept
Investor
The Capital of Prague
Year
2004−2012
Location
Prague 1; Prague 2; Prague 3; Prague 4; Prague 7; Prague 8
25
orders
Plotting of the
Capital of Prague
Archive into the
photography
(Prague)
CO M P L E T I O N O F T H E C A P I TA L
OF PRAGUE ARCHIVE
The construction allows concentration of the Capital of Prague
Data Center, the Digitalization Center, the Digital Documents
Archive and the MHMP Administration Archive in an ideal
operational sequence to the existing building that has been
completed structurally in the year 1997. It means construction
of a new operational – deposit building, extension of the
conference hall in the existing entrance and administration
building and the energy-center reconstruction. The building is
located at the south façade of the existing service building to
which it connects by an interconnecting communication link
on the level of all the floors. Regarding its mass, it is identical
with the existing deposit building; one underground and
six aboveground floors are realized in the first stage of the
construction. The bearing elements of the building and of the
foundation structures have been designed and realized so
that they would allow the building extension to the final 12
aboveground floors in the future.
26
Activities realized
❚
volume study
❚
DÚR
❚
DSP
❚
DZS
❚
author supervision
❚
realization documentation
Investor
The Capital of Prague
Year
2008−ongoing
Location
Prague 11
Sanitary sewer
(Prague)
E X T E N S I O N O F T H E A 2 S A N I TA RY S E W E R
Construction of the sanitary sewer between the Do Koutů
street in Modřany and the pump station in the Cholupice
village. Considering the terrain segmentation, it is necessary
to use for the designed connection of the Cholupice
development drifted sections on gravitational pipelines to
overcome the relevant terrain peaks. It concerns a sewer
network of gravitational sanitary sewers in the total length
of 5.7 km. Part of the sanitary sewers is realized in a cut-andcover excavation and part in driven drifts. Connection of the
side drifts with significant bottom exaggeration of the main
sewer has been designed with well-hole shafts.
Activities realized
❚
DSP
❚
author supervision
❚
realization documentation
Investor
The Capital of Prague
Year
2012
Location
Prague 12
27
orders
The Urban Ring
tunnel color
design is based
on the Study
conclusions
STUDY OF THE URBAN RING TUNNEL
S E C T I O N S O P E R AT I O N S A F E T Y
Risk analysis of six sections of the Urban Ring from Zlíchova to
Pelc-Tyrolka with the total length of 12,3 km. The goal of the
study elaboration was a professional estimate of accidents
number with classification according to individual sections
and according to the accident type; next, proving of individual
sections connection and of functionality of the entire west
and north part of the Ring, evaluation of the route control
system, of the safety measures planned and recommendation
of the structural design and of technological equipment
modifications, with regard to improving of the traffic
efficiency and to safety upgrading. A Bayes causal network
specifying the most important elements of the tunnel safety
has been prepared for the risk analysis. The analysis resulted in
specification of number of health injuries in one year/1 km of
the tunnel section, i.e. a parameter the value of which can be
compared with the internationally accepted risk level.
28
Activities realized
❚
coordination of the study elaboration
and consultation
❚
assessment of the operational and fire ventilation
of the tunnels
❚
assessment of the tunnel structures utilization
for civil defense purposes
Investor
The Capital of Prague
Year
2001–2003
Location
Prague
Visualization
of the operators’
hall in the MOS
building (Prague)
M U LT I F U N C T I O N A L O P E R AT I O N A L C E N T E R
MALOVANK A
The multifunctional operational center Malovanka will serve
as an integrated center for traffic control and equipment
of roads, highways and tunnels, situated in the area north
of the Bělohorská street, between the Pyramida hotel and
the Na Malovance street. It is located above the unfinished
garages structure above the north exit from the Strahovský
tunnel. The existing control center will be relocated there
from the Na Bojišti street. It is a reinforced concrete monolithic
columnar frame; from the layout and structural viewpoint, it is
divided into two parts. Halls of the Technical management of
roads and highways centrals, the MHMP crisis control center
department and standard administrative an social areas are
located in Part A. Part B will include an underground parking
area and the Diesel generator technologies. The structure
shell will be constructed as an aluminum glassed-in system
with heat-insulated reinforced concrete structure. The
building construction will allow integration of traffic control
and of the roads, highways and tunnels equipment, increased
smoothness and safety of all transportation types, integration
of those sectors that participate in activities connected
with traffic control at normal traffic and at emergencies and
creation of the required space and supporting technologies
for other constructions of Prague main highways or telematic
transportation systems to be completed.
Activities realized
❚
studies
❚
DÚR
❚
DSP
❚
DZS
❚
author supervision
❚
engineering and mandatory activities
❚
work of an Health Safety and Protection at Work
coordinator at the construction preparation
Investor
The Capital of Prague
Year
2009 – ongoing
Location
Prague 6
29
activities
RESEARCH
The SATRA Company participates in research projects in the area
of fire ventilation and of vehicular tunnels safety, in measuring
of stress and evaluation of engineering structures condition.
on methodologies of vehicular tunnels risks assessment in
individual Member States and advocacy of the Czech Republic
interests in the Committee in compliance with the approved
transportation concept in the ČR.
Smoke spreading at fire in a road tunnel
A project from the area of computer modeling regarding
vehicular tunnels ventilation in case of a fire, with application of
the CFD – Computational Fluid Dynamics program, applied to
the Prague Urban Ring. The issue has been researched with the
application of the Euler-Lagrange´s CFD model. The modeled
tunnel geometry corresponds to the road tunnel Myslbekova –
Pelc-Tyrolka that is a part of the Prague Urban Ring.
Risks in vehicular tunnels
The Project should ensure fulfillment of requirements at
creation and implementation of the European methodology
for the Czech Republic vehicular tunnels safety and risks
assessment. The Project content and goals take into
consideration the requirements of the European Parliament
and Committee Directive 2004/54/ES, On minimum safety
requirements on tunnels on main surface routes; it imposes
several tasks on the operators and on the EU member states.
In particular, the Project should allow fulfillment of the above
obligations, ensure compliance of Czech standards and of the
European methodology that is being created and preparation
of suitable conditions for timely introduction of the European
risks assessment methodology in the Czech Republic.
Activities in the Vehicular Tunnels Safety Committee
The Directive 2004/54/EC, dated April 29, 2004, specifies the
minimum safety requirements on tunnels of the trans-European
vehicular network. Based on a mandatory contract with the
ČR Ministry of Transportation, the SATRA Company managing
director and general manager, D. I. Ludvík Šajtar, is the Czech
Republic representative in the Vehicular Tunnels Safety
Committee within the Committee for Power and Transportation
of the European Commission. Besides other, it includes ČR
representation at the Committee sessions, preparation of reports
concerning the condition of the Directive implementation in the
Czech Rule of Court, elaboration of reports concerning situation
in the Czech Republic for the EC committee, preparation of
reports on experience with the Directive implementation and
30
Experimental verification of tunnel linings effect
The number of tunnels under construction and tunnels which
will be constructed in the furure keeps on increasing. Their
importance is essential for road and railway transport and it
is impossible to allow unnecessary traffic closures or other
traffic restrictions. Designing of the final tunnels lining is
a comparatively complicated process. The static effect depends
on the tunnel lining interaction with the rock massif and the
loading depends on many factors: the lining rigidity, stope
size, geotechnical conditions, construction progress and last
but not least, on climatic conditions. The structure evaluated is
often statically indefinite and it is impossible to apply directly
the designing methods according to the limit values in a form
that is standard in case of surface structures. Therefore, the
lining design must be safe, economical and simultaneously, it
must fulfill the highest requirements on utility characteristics
for the entire lifetime of the Work. Experience with longterm functions and real stress vary all over the world and it is
essential to verify the relevant experience in Czech conditions.
Innovation of evaluation methods of the existing engineering
structures
The main goals of the Project focused on the Prague region
include elaboration, implementation of and making available the
methodological principles of the existing structures reliability
assessment, with focus on concrete and walled structures (e.g.
panel and historical buildings). The methodology investigated
includes a part that is not covered in the European regulations
being introduced – evaluation of the construction condition
and of its residual lifetime, with the goal to optimize its renewal
plan. The methodology includes specification of resistance
models and of loading effects, using statistic methods, reliability
evaluation by the partial coefficient method and analysis of
economical and social risks. The general principles specified in
the new standard ISO 13822, Evaluation of existing structures
and in the up-till-now applied ČSN standards are being analyzed.
Emphasis is put also on economical evaluation of securing the
structures that are impacted by building activities (realization of
surface structures).
Tunelový komplex
Blanka
MĔSTSKÝ OKRUH
2007
MĔSTSKÝ OKRUH
2007
PROFESSIONAL ACTIVITIES
❚
Tunnel committee ITA-AITES
❚
World Vehicular Company PIARC
❚
Czech Vehicular Company ČSSI
SATRA_obal_CZ.indd a
❚
Czech Concrete Company ČBS
❚
Czech Geotechnical Company
❚
Participation in editorial boards
of professional titles
❚
Participation in preparatory committees
and scientific boards of international
professional actions
SATRA_obalDVD_MO2007.indd 1
24.4.2007 11:30:59
fotorepor
táž v praxi
věda
a v ýzkum
text a foto Jakubtext
Karlíček,
A | grafické
SATRA,podklady
spol. s r.o.
a
Tunelový komplex Blanka,
aktuální stav k 15. březnu 2012
23.3.2007 12:50:06
SATRA_potiskDVD_MO2007.innd 1
Výstavba tunelového komplexu Blanka, součásti severozápadního segmentu Městského
okruhu v Praze, se posunula opět o něco
blíže svému dokončení. I když byly zkráceny finanční prostředky na výstavbu, což
ovlivňuje i termín dokončení stavby, který je
posunut na rok 2014, práce pokračují poměrně intenzivním tempem. V uplynulém roce
byly zcela dokončeny veškeré razičské práce,
značným tempem rostou konstrukce tunelů
a technologických center ve stavebních jámách v západní části stavby. Od Hradčanské
■
k portálu v Tróji probíhají dokončovací práce
v tunelech, a byly také zahájeny montáže
technologického vybavení v prvních montážních úsecích. Aktuální stav výstavby tunelu
Blanka mapuje následující fotoreportáž. Informace o dění na staveništích lze nalézt na
adrese www.tunelblanka.cz.
W Před portálovou stěnou ražených tunelů navazují klenbové tunely na objekt technologického centra TGC1, do nějž je napojen vzduchotechnický
kanál, kterým bude odváděn vzduch z tunelu do výdechového objektu
v ulici Nad Octárnou. V technologickém centru je téměř dokončena
úroveň tunelové části, v současnosti se budují stěny druhé úrovně nad
dopravními tunely. Trasa Městského okruhu zde přechází do raženého
úseku Brusnice dále k Prašnému mostu. Definitivní ostění severního
tunelu je dokončeno v celém rozsahu. V jižním tunelu zbývá dokončit
klenbu definitivního ostění v cca patnácti sekcích u portálu Myslbekova.
realizace
text a foto Jakub Karlíček, SATRA, spol. s r.o.
Tunelový komplex Blanka:
aktuality z výstavby, červenec 2012
V Na staveništi Patočkova pokračuje výstavba hloubených tunelů mezi
křižovatkou Malovanka a technologickým centrem TGC1. V prosinci
roku 2011 byl obnoven provoz nad stropem tunelu, budovaném mezi
zástavbou metodou podzemních konstrukčních stěn. Na snímku v pozadí je vidět provoz v části obnovené ulice Patočkova. V současnosti jsou
budovány klenbové tunely, které navazují na objekt technologického
centra TGC1. V severním tunelu (na snímku vpravo) zbývá dokončit
Výstavba
Městského
okruhu
v úseku
klenbu u dilatačního
dílu D15. V jižním
tunelu se dokončuje
spodní
část
dilatačního dílu D16 a klenba v rozsahu dilatačních dílů D12–D16.
Malovanka – Pelc-Tyrolka, známého také pod názvem
Tunelový komplex Blanka, začala v roce 2007
W Na Prašném mostě pokračují práce na výstavbě hloubených tunelů hlavní
trasy, vjezdové a výjezdové
rampy, technologického
TGC2 Soubor
(umístěna staveništích
Troja acentra
Letná.
tří na sebe
ného mezi dopravními tunely) a podzemních garáží. Na obrázku je vidět distaveb
evidenčními
čísly 0079 Špejlatační díl PG2, kdenavazujících
byla dokončena betonáž
stropusna
celou šířku objektu.
V současnosti pokračuje výstavba podzemních garáží nad tunely a technoPelc-Tyrolka,
0080
Prašný
most – Špejchar
logickým centrem. char
V pozadí–lze
vidět navazující úsek
dilatačního
dílu SJ6
hloubených tunelů a
v ulici
Milady
Horákové. V prostoru
dosud chybějících
9515
Myslbekova
– Prašný
most – doplňuje ještě
konstrukcí, mezi díly PG2 a SJ6, probíhal v loňském roce záchranný archeologický průzkum. Při
hloubení
stavební
jámy
bylo
nalezeno
77
kostrových
samostatná investiční akce, stavba s evidenčním
hrobů. Na základě nálezů šperků a keramiky bylo možné toto pohřebiště
0065 Strahovský
datovat do sklonku číslem
9. století, respektive
první poloviny 10.tunel,
století. 2. stavba. Ta zahr-
nuje dostavbu mimoúrovňové křižovatky Malovanka a úsek hloubených tunelů mezi portálem
v křižovatce a technologickým centrem TGC1,
které je již součástí stavby 9515.
PUBLISHING ACTIVITIES
podzemní
stavby
věda
a v ýzkum
v praxi
❚
Articles in professional journals, including
impacted titles
❚
Articles on journals and newspapers addressed to
the broad public, as a part of projects presentation
❚
Contributions in professional conferences
in the Czech republic and abroad
❚
Audiovisual works preparation
❚
The Mrázovka Tunnel Publication (2004)
❚
Publication Underground constructions
in the Czech Republic (2007)
❚
Presentations for the broad public
❚
Pedagogic activities
❚
Cooperation with specialized high schools
and universities
60
stavebnictví 04/12
24.4.2007 11:26:58
Od července 2010 se realizuje také
výstavba nového sdruženého mostu přes Vltavu mezi Holešovicemi
a Trojou, kde bude stavba ústit
do křižovatky Troja na Městském
okruhu. Most bude po svém dokončení nejširší v Praze a bude sloužit
pro vedení 2 x 2 jízdních pruhů pro
automobilovou dopravu. Doplní
je stezky pro cyklisty, chodníky
a především střední tramvajové
těleso. Po převedení dopravy na
nový most bude po 33 letech (!)
zrušeno mostní provizorium z roku
1981, lidově zvané Rámusák.
Aktuální dění
na staveništích
(červenec 2012)
text Ing. Jiří Zápařka | grafické podklady SATRA,
textspol.
A | grafické
s r.o., archiv
podklady
autora
a
Nejprve byly zahájeny práce na
stavbě 0079, byly hloubeny stavební jámy Troja a Letná. Z trojské strany byla v září 2007 zahájena ražba
2,2 km dlouhého raženého úseku,
zahrnujícího také ražené technologické centrum včetně rozsáhlé strojovny vzduchotechniky. V červenci
2009 začala protiražba z Letné; v té
době již probíhaly také práce na staveništích Hradčanská, Prašný most
a Myslbekova, odkud byla v říjnu
2009 zahájena ražba druhého
raženého úseku. V dubnu 2005 započala v předstihu výstavba MÚK
Malovanka, včetně portálového
objektu tunelu.
V prostorově a dopravně velmi
exponovaném území mezi tramvajovou smyčkou Špejchar a křižovatkou Prašný most se hloubené
tunely budovaly tzv. modifikovanou
milánskou metodou. Po vytěžení
mělké jámy byly vybudovány podzemní konstrukční stěny a stropní
deska, nad níž byly obnoveny
■
inženýrské sítě, byl upraven povrch
a následně obnoven provoz. Pod
V Obr. 1. Situace tunelu Blanka v severozápadní části Městského okruhu
ochranou stropní desky byl pak čelně vytěžen profil tunelu a byla vybudována spodní rozpěrná deska.
Obdobným způsobem se budovaly
i tunely v prostoru Patočkovy ulice
Značná část konstrukce tunelu
je umístěna do stavební jámy
hloubené z povrchu. Vzhledem
k nebývalému rozsahu odkryvu
(místy více než 25 metrů) tak stavba
tunelu představovala jedinečnou
příležitost pro archeology – mohli
zachytit stopy osídlení sahající až
do starší doby kamenné. Od října
2008 se při výstavbě prováděl
záchranný archeologický průzkum,
vedený Archeologickým ústavem
AV ČR v Praze a firmami Archaia
a Prospecto. Byla učiněna řada
významných nálezů, z nichž ten
nejdůležitější až v dubnu 2011. Severně od ulice U Prašného mostu
a barokního bastionu XIV. bylo
objeveno dosud neznámé pohřebiště, celkem bylo prozkoumáno
77 kostrových hrobů se 78 nebožtíky, z nichž nejméně 29 patřilo
dětem včetně kojenců. Na základě
nálezů šperků a keramiky je možné
toto pohřebiště datovat do sklonku
9. století až první poloviny 10. století.
Svůj otisk v krajině severně od
Pražského hradu zanechalo i období novověké. Stavba tunelu
Blanka ve staveništích Prašný most
a Myslbekova se bezprostředně
dotýká severního pásma barokního
opevnění Prahy. V rámci výstavby
se revitalizuje prostor pod bastiony
a vytvářejí se v dříve nepřístupných
lokalitách nové parkové plochy pro
veřejnost.
Křižovatka Malovanka
V současné době je téměř dokončena, pouze doprava je vedena
v některých směrech odlišně od
výsledného stavu. Hloubené tunely pod Patočkovou ulicí jsou ve
stadiu hrubé stavby, na stropě
tunelu budovaného v podzemních
konstrukčních stěnách je obnoven
provoz od Břevnova až ke křižovatce s Myslbekovou ulicí.
Staveniště Patočkova
Navazující úseky klenbových hloubených tunelů ve staveništi Patočkova jsou ve stadiu hrubé stavby
(obr. 1), téměř dokončeny jsou až
k objektu technologického centra TGC1. Probíhají hydroizolace
konstrukcí, zásyp stavební jámy
a jeho hutnění po vrstvách. Staví
se centrum TGC1 ve 4. úrovni nad
komunikacemi (obr. 2). Dokončen
je také vzduchotechnický kanál
a šachta, propojující centrum TGC1
s výdechovým objektem v ulici Nad
Octárnou. V ražených tunelech
Brusnice je hotové definitivní ostění. Pokládají se odvodňovací prvky
a obrubníky, ukládají chráničky
a betonují se chodníky v tunelech.
Staveniště Prašný most
Na tomto staveništi jsou v celém
rozsahu dokončeny hloubené tunely a vjezdová rampa 4 ze Svatovítské ulice. Staví se podzemní
garáže nad tunely, technologické
centrum TGC2 a výjezdová rampa 3
do křižovatky Prašný most (obr. 3).
V ulici Milady Horákové jsou provedeny zásypy na stropě tunelu
a připravuje se obnova komunikace.
V rámci výstavby Městského okruhu byl také snesen původní most
přes železniční trať Praha – Kladno
ve Svatovítské ulici. Nahradil jej nový
most v šířce celé komunikace, propojující Dejvice s křižovatkou Prašný most. Most je v současné době
stavebně dokončen, doprava je
vedena provizorně po jeho východní třetině. Je připravena definitivní
tramvajová trať na mostovce a na
severním předpolí mostu (obr. 4).
Západní zábradlí mostu včetně pylonů získá povrchovou úpravu podle
požadavků památkářů; východní
zábradlí mostu se vybuduje až po
převedení dopravy na mostě do
definitivního uspořádání. Zajíma-
WObr. 1. Zásyp jámy klenbových tunelů ve staveništi Patočkova
Větrací systém tunelu Blanka
Ing. Jiří Zápařka
Vystudoval Vysoké učení technické
v Brně. Od roku 1998
spolustavebnictví
08/12
50 je externím
pracovníkem společnosti SATRA,
spol. s.r.o., v oboru větrání silničních
tunelů.
E-mail: [email protected]
Příspěvek se zabývá problematikou návrhu, realizace a uvedení do provozu u systému větrání tunelu Blanka. Popisuje základní požadavky, popis
funkce systému a jeho částí, představuje závěry
studie o využití filtrace odváděného vzduchu
pomocí elektrostatických odlučovačů. Závěrem
jsou zmíněny zkoušky větracího systému a jeho
prvků před uvedením do provozu.
Funkce a výběr systému větrání
Silniční tunely jsou vybavovány větracím systémem ze dvou
základních důvodů:
62
Q při všech dopravních stavech musí zabránit akumulaci výfukových
zplodin v prostoru tunelu;
Q musí zabránit šíření tepla, kouře a výparů při požáru nebo jiných
mimořádných událostech, osobám v tunelu pak musí během této
události zajistit cestu do bezpečí bez kouře a výparů.
Pro dosažení těchto cílů existují dvě základní koncepce větrání:
Q podélné větrání, kdy je proudění vzduchu v tunelu zajištěno podélně s osou tunelu;
Q příčné větrání, kdy je čerstvý vzduch přiváděn zvláštním kanálem
vedeným paralelně s tunelem a je zaústěn po určitých vzdálenostech do tunelu. Vzduch provětrává tunel příčně k ose tunelu a je
odváděn do paralelního odvodního kanálu.
O výběru systému větrání rozhoduje řada dalších okolností:
Q zda se jedná o tunel jednosměrný, nebo obousměrný; městský,
nebo dálniční; bez sklonu, nebo s velkým podélným sklonem;
Q předpokládaná intenzita provozu, podíl těžkých nákladních vozidel
z celkového počtu, výskyt dopravní kongesce, doprava nebezpečných nákladů tunelem;
Q místní požadavky na životní prostředí, které určují, zda je možné
vypouštět znečištěný vzduch přímo z portálu, nebo ne;
Q zvláštní požadavky provozovatele nebo jiných dotčených orgánů;
Q místní meteorologické podmínky (vítr, teplota, tlak na portály tunelu);
Q výběr větracího systému ovlivňuje řadu dalších aspektů souvisejících úzce s projektem tunelu (strojovny, výdechy pro přívod
a odvod vzduchu na povrchu, příčný řez, únikové cesty, elektrický
příkon silového napájení).
stavebnictví 04/12
31
awards
In an
underground
structure, a man
can be almost
imperceptible. The
mined ventilation
machine room is
one of the biggest
mined works
in the Czech
Republic. Only
a group of people
lends the structure
its real human
dimension.
2011
❚
2004
T&T Photo Competition 2011, second in the world
photographic competition – the Human dimension
photo from the driven engine room of the Blanka
tunnel
(Jakub Karlíček)
2006
❚
Ecologically realized construction of the year 2006
– Center of the ČZÚ economic-managerial studies
2005
32
❚
Transportation construction of the year 2005
– the Mrázovka tunnel
❚
Outstanding concrete structure 2003–2004,
certificate of merit – the Mrázovka tunnel
❚
TAURUS, the first prize in the realization category
– the Mrázovka tunnel
❚
Zlatá Pečeť, the first prize in the specialized
and technical literature category – The Mrázovka
Tunnel publication
❚
The Quido Záruba, Academician´s award – design
and management of the exploratory gallery for the
Špejchar – Pelc-Tyrolka construction
(D. I. Alexandr Butovič, PhD.)
references
S TAT E O R G A N I Z AT I O N S
FIRMS AND INSTITUTIONS
❚
The Capital of Prague
❚
Metrostav, a.s.
❚
Ministry of Transport of the Czech Republic
❚
Pražská plynárenská Distribuce, a.s.
❚
Ministry of Defense of the Czech Republic
❚
Subterra, a.s.
❚
Ministry of Interior of the Czech Republic
❚
ČKD DIZ Prague, a.s.
❚
Ministry of Health of the Czech Republic
❚
Amberg Engineering Brno, a.s.
❚
Ministry of Education, Youth and Physical Training
❚
Telefónica Czech Republic, a.s.
❚
The Central Region
❚
ENERGO-PRO, s.r.o.
❚
Czech National Bank
❚
The Královský pivovar Krušovice, a.s. Brewery
❚
Czech Management of Airports
❚
Inženýring dopravních staveb, a.s.
❚
The Department of the Capital of Prague Development
❚
VIS, a.s.
❚
Directorate of Roads and Motorways
of the Czech Republic
❚
ZAVOS, a.s.
❚
Matsushita Television Central Europe, s.r.o.
❚
National Highway Company of the Slovak Republic
❚
The Královské Vinohrady teaching hospital
❚
The Magement of Railroad Transport Routes
❚
The Thomayerova teaching hospital
❚
The Czech Broadcasting Company
❚
The Institute of Clinical and Experiment Medicine
❚
National Heritage Institute
❚
The Czech Olympic Committee
❚
Technical Management of Highways and Roads
of the Capital of Prague
❚
Special schools for aurally disabled in Prague
❚
❚
The Charles University in Prague
The Military Accommodation and Construction
Management in Prague
❚
The Czech Agricultural University in Prague
Č E S K Á KO M O R A
AU TO R I ZO VA NÝC H
I N Ž E NÝR Ů A T E C H N I K Ů
Č I N NÝC H V E V ÝS TAV B Ě
ITA COSUF
ČESKÁ
TUNELÁŘSKÁ
ASOCIACE
CZECH
TUNNELLING
ASSOCIATION
ITA Committee on Operational
Safety of Underground Facilities
www.satra.cz

Podobné dokumenty