1. SZT Komořany (today United Energy a.s.)
6kV substation
ČEZ, a.s., Počerady Power Plant
Desulphurization of units 2,3,4
1. SZT Komořany
Reconstruction of cooling circuit
1. SZT Komořany a.s. (today United Energy a.s.) 2000-2001
Reconstruction of 6kV substation
SČE a.s. – Chotějovice
Reconstruction of 35kV substation
Teplárna Ústí nad Labem
Reconstruction of 6kV substation
United Energy a.s.
Reconstruction of R6 MOLI / 6kV substation
United Energy a.s.
Reconstruction of R04 KYII / 0.4kV substation
Středočeská energetická a.s.
Overhaul of R 110kV substations in the area of RD North from ED STE
VE Štěchovice – ČEZ, a.s.
Reconstruction of electric HV, LV equipment after flooding
TR Chotějovice – SČE, a.s.
Automatic equipment for inductor tuning
SČE, a.s.
Overhaul of Výškov 22kV substation
Siemens s.r.o.
Installation of 22kV substation: R 22 Ústí – North, stage II
Středočeská energetická a.s.
TR 110 Týnec – construction of bays 19-21
ABB s.r.o.
R 110 Strakonice – new encased JČE substation
ABB s.r.o.
Additional equipment for encased substation 110/22kV Červený Vrch (PRE)
ČEZ, a.s.
Dalešice Hydroelectric Power Plant – overhaul of TG 4 – electric part
United Energy, a.s.
Reconstruction of 110kV substation: Stage I
Středočeská energetická a.s.
SP Energocentrum Kralupy – reconstruction of 22kV switching substation
ČEZ a.s., Elektrárna Ledvice
TG2 – repair of VHV surge arresters
ČEZ, a.s., Chvaletice Power Plant
Reconstruction of 110kV substation
ČEZ a.s. – Mělník Power Plant
R110 – reconstruction of V907 / V908 (110kV) feeder bays
ČEZ a.s. – Mělník Power Plant (EMĚ I)
Innovation of instrument transformers at R110 – stage Ietapa
ČEZ a.s. – Poříčí Power Plant
TG3 : supply and installation of generator switch
ČEZ a.s. – Prunéřov II Power Plant
R420 – replacement of 420kV disconnectors
ČEZ a.s. – Prunéřov II Power Plant
R420 – sales measuring of 420kV / V466 line
1997
1997
1999
2000-2001
2001
2002
2002-2003
2002
2002-2003
2002
2002
2002-2003
2003
2003
2003
2003-2004
2003-2004
2004
2004
2004-2005
2005
2005
2005
2005
2005
1
SIEMENS s.r.o.
2005
R110 Líšnice – replacement of 110kV breakers for transformer fields
TENEL ČR s.r.o.
2005
Tisová Power Plant: reconstruction of TG3 excitation
United Energy, a.s.
2006
Reconstruction of 110kV substation: stage IIetapa
United Energy, a.s.
2006
TG20 – Frequency converter delivery and installation for condensate pump
ČEZ a.s. – Hodonín Power Plant
2006
Replacement of instrument transformers at R110 – stage IIIetapa
SE - ZVN s.r.o.
2006
TR Řeporyje – installation work during reconstruction of R400
ABB s.r.o.
2006
VEDA / TG3 – replacement of generator breaker
United Energy, a.s.
2006
Compressor room / cooling water: electric and M&R part
ČEZ a.s. – TR110 Jindřichov
2006
Reconstruction of 110kV substation
ČEZ a.s. – Mělník Power Plant
2006
Modernization of T19 transformer
ČEZ a.s. – Mělník Power Plant (EMĚ II)
2006
Reconstruction of R6-9 unit substation
SIEMENS s.r.o.
2006
R110 Líšnice – replacement of 110kV breakers for line bays
ČEZ a.s. – Chvaletice Power Plant
2006
Renewal of insulation of 110kV substation
United Energy, a.s.
2006
Monitoring of 6kV substations: stage Ietapa
Invelt elektro s.r.o.
2006
Restoration of back-pressure TG20 plant at TKY
ATLAS COPCO s.r.o.
2006
Reconstruction of compressor plant at TKY
ČEZ a.s. – Dalešice Power Plant
2006
TG2 overhaul: electric part + control and management system
invelt elektro s.r.o.
2006
Reconstruction of MOLI exchanger station + starting oil pump at TKY : electric and M&R
part
SIEMENS s.r.o.
2006 - 2007
R110 Chudeřice – construction of new 110kV substation
AMIKRO s.r.o. (United Energy a.s.)
2007
Retrofitting of boiler unit K06 at TKY: electric part
UPS Servis, s.r.o.
2008
TG5 – superior turbo-set control at TKY
ČEZ Distribuce a.s. – R35 Labe
2007-2008
Reconstruction of 35kV substation
ČEZ Distribuce a.s. – TR110 Kolín East
2007-2008
Reconstruction of 110kV substation
United Energy, a.s.
2007-2008
Replacement of central source UPS in TKY
United Energy, a.s.
2007-2008
Monitoring of 6kV substations: stages II + IIIetapa
ČEZ a.s. – Poříčí Power Plants
2007-2008
Reconstruction of 6kV substations – R6.0 and R6.1
ČEZ a.s. – Mělník Power Plant
2007-2008
Modernization of T20, 110/6kV transformer
United Energy, a.s.
2008
2
Reconstruction of 110kV substation: stage IIIetapa
TENEL s.r.o.
2008
Tisová Power Plant – reconstruction of TG2 field system
United Energy, a.s.
2008
Replacement of FM for CHČ7 (500kW) cooling pump
EGE montáže s.r.o. (ČEPS, a.s.)
2008
TR420 – replacing equipment in V438 bay
ČEZ a.s. – Poříčí Power Plants
2008-2009
Reconstruction of sales and balance measuring
KLEMENT a.s.
2008-2009
Ledvice Power Plant – electric installation of the coal handling unit
ČEZ a.s. – Dvůr Králové Heating Plant
2009
Repair of TG1 cable outlet
ČEZ a.s. – Dvůr Králové Heating Plant
2009
Reconstruction of sales and balance measuring
ČEPS, a.s.
2009
R420 Horní Životice – replacement of instrument transformer in ACA04 bay
ŠKODA PRAHA Invest s.r.o. (ČEZ, a.s.)
2008-2009
OB_34.3 - electric part Ledvice Power Plant, water treatment plant and coal handling
system for 660 MW unit
ČEZ a.s. – Chvaletice Power Plant
2009
Reconstruction of the power supply part of the common 6kV substation
ČEPS, a.s.
2009
TR Malešice – reconstruction of switchgears for auxiliaries
Teplárna Trmice a.s.
2009
Backup supply for BIOETHANOL Trmice
ČEZ a.s. – Dalešice Power Plant
2009-2010
TG1 – replacement of generator breaker
ZAT a.s. (ENERGO PRO CZ s.r.o.)
2009-2010
Reconstruction of MVE Small Hydroelectric Plant – electric part
ALSTOM s.r.o.
2010
DENOx / EPR2 – reconstruction of fan mills: electric and M&R part
ČEZ a.s. – Prunéřov 2 Power Plant
2010
B22 – replacement of generator breaker
ČEPS, a.s.
2010
TR Nošovice – replacement of 400kV breakers in ACA04, ACA08 bays
MAPRO s.r.o.
2010
Ševětín Photovoltaic Power Plant – construction of 110kV, 22kV substation and auxiliaries
ČEZ a.s. – Poříčí Power Plants
2010
Frequency converters of primary fans FK7 and FK8
invelt elektro s.r.o.
2010
Reconstruction of TG21 protections at TKY
ATLAS COPCO s.r.o.
2010
Enlargement of compressor station at TKY (KM4)
ISTAR s.r.o.
2010
FVE Žíželice – 22kV service line and distribution system
ŠKODA PRAHA Invest s.r.o. (ČEZ, a.s.)
2009-2010
OB_64.03 – temporary installations for stage 4 in Ledvice Power Plant
United Energy, a.s.
2010
Replacement of KYI rectifiers at TKY
Teplárna Trmice a.s.
2010
ČS Labe – reconstruction of 6kV substation stage 1
ČEZ Distribuce a.s. – TR110/22 Slaný
2009-2011
Reconstruction of 110/22kV transformer station
ČEZ a.s. – Dvůr Králové Heating Plant
2010-2011
Reconstruction of 6kV and 35kV substations
3
ČEZ a.s. – Chvaletice Power Plant
Reconstruction of the common 6kV substation - outlet part
Teplárna Trmice a.s.
ČS Labe – reconstruction of 6kV substation stage 2
ČEZ ICT Services, a.s.
Implementation of EPC optimization system
NOEN, a.s.
EPRU II – supply and installation of temperature distribution boards for coal
ČEPS, a.s.
TR Nošovice – adding measuring sections for HUS
ŠKODA POWER s.r.o.
ELENZ – project, supply and installation of cables for OB04 (machine room)
ČEZ a.s. – Dvůr Králové Heating Plant
Complete supply and installation of EN
United Energy a.s.
R6MOLI – arc protection replacement
UNIREC s.r.o. (ČEZ, a.s.)
Electric heating for drinking water piping to AB
ČEZ Distribuce a.s. – TR110 Hrádek
Connecting of 32MW Václavice Wind Power PLant
ČEZ a.s. – Chvaletice Power Plant
Reconstruction of 6kV substation excavating station
ČEZ a.s. – Prunéřov 2 Power Plant
B21 – replacement of generator breaker
United Energy a.s.
Replacement of frequency converter in CHČ2 cooling pump
invelt elektro s.r.o.
Reconstruction of TG21 turbine set at TKY
V-systém elektro s.r.o.
Strakonice Heating Plant – installation of heating cables
United Energy a.s.
FM installation for EN2 electric feed pump
Teplárna Trmice a.s.
Repair of 6kV – R6K5 HV switchboard
2011
2011-2012
2011-2012
2011-2012
management
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012
2012-2013
2012-2013
Chemical industry
Chemopetrol , a.s. Litvínov – new Air Separation Plant
1997
10kV substation
Chemopetrol, a.s. Litvínov – T700 Power Plant
Desulphurization
ABB EJF a.s. – Chemopetrol, a.s. Litvínov
Monitoring system
Schneider Electric CZ s.r.o. – Chemopetrol, a.s. Litvínov
Encased 110kV substation
Invelt Energo – SETUZA a.s.
Generator outlet
AIR PRODUCTS Litvínov
Construction of new oxygen plant – electric part
Louka u Litvínova – ABB s.r.o. Praha
Construction of magnesium recycling plant
Lovochemie, a.s.
Replacement of auxiliaries transformers 6/0.4kV
1997
1998
1999-2000
2000
2001-2002
2001
2001
4
Construction of nitric acid plant KD 6 – Off-Site: Lovochemie, a.s.
6kV substation
AIR PRODUCTS Litvínov
LV and HV part – 5MW oxygen compressors
2001-2002
Lovochemie, a.s.
Overhaul of electric equipment of LAV II plant (neutralization)
Lovochemie, a.s.
Raking machine LAV North: Overhaul of electric equipment
Lovochemie, a.s.
Reconstruction of HV, LV electric equipment after flooding
Kaučuk, a.s.
T100 – output increase (transformers 110/6.3kV, 40MVA)
Kaučuk, a.s.
Ethyl benzene II – OSBL – drawing offspec: LV part
Lovochemie, a.s.
Reconstruction of 6kV substation: R 81 (ÚLV)
Spolana Neratovice a.s.
Reconstruction of 6kV substation: R 82 (waste water treatment plant)
Kaučuk, a.s.
Reconstruction of TR 213, 6kV transformer station
EGÚ České Budějovice s.r.o.
Breaking programme at Kaučuk, a.s. – 6kV substation
Lovochemie, a.s.
Reconstruction of 6kV substation: R91 (ÚV)
Chemoprojekt, a.s.
SETUZA, a.s. – glycerin production: electric part
Lovochemie a.s.
Replacement of wiring on scaffold bridge – fuel hopper
TENEL ČR s.r.o.
Chemopetrol, a.s. : reconstruction of TG12 and TG14 excitation
Lovochemie, a.s.
Reconstruction of 6kV substation: R21 (HSS)
Lovochemie, a.s.
Replacement of compensation inductors for T101 and T102
ABB s.r.o.
Chemopetrol – repair of R200 6kV substation: POX power supply
SKANSKA a.s.
Intensification of the filling station in Klobouky MERO, a.s.
Chemoprojekt, a.s.
FAME Ústí nad Labem – power current distribution systems: electric part
TENZA a.s.
Utility main for bio-fuels – power supply 22kV
BIOETHANOL TRMICE
Construction of HV, LV substations and technology
Lovochemie, a.s.
Reconstruction of 6kV substation: R28 (pumping station)
MERO a.s.
Intensification of the filling station in Nové Město
Chemoprojekt, a.s.
Bio-diesel production plant MEROCO - Leopoldov: electric part
TENEL s.r.o.
Chemopetrol - reconstruction of the field systems TG2 and TG9
ABB s.r.o.
KORADO Ústí nad Orlicí - replacement of 22kV disconnectors
Lovochemie, a.s.
2002
2002
2002
2002
2002-2003
2002-2003
2002-2003
2003
2003-2004
2003
2004
2005
2005
2005
2006
2006
2006
2006
2006-2007
2007
2007
2007
2007-2008
2007-2008
2007-2008
2008
2008
5
Reconstruction of 6kV substations: SUPERFOSFÁT and NPK
Chemoprojekt, a.s.
FAME PREOL Lovosice – power current distribution systems: electric part
MERO a.s.
Intensification of the filling station in Velká Bíteš
DALKIA ČR a.s.
Bioethanol – connecting backup supply at 22kV level
MERO a.s.
CTR Nelahozeves – replacement of 110kV breakers
MERO a.s.
CTR Nelahozeves – modernization of main 6kV substation
Lovochemie, a.s.
Switchover of transformers LAV3 to R21 substation - HSS
MERO a.s.
Inspection of steel structures of 110kV line towers
Lovochemie, a.s.
Reconstruction of 6kV substations: R11 and R19
Lovochemie, a.s.
Reconstruction of Lime Mill – electric part
MERO a.s.
Modernization of energy consumption reader at Central Oil Pumping Station
ABB s.r.o. (UNIPETROL a.s.)
TS of Energetika plant – replacement of HV switchgear protections
UNIPETROL RPA s.r.o.
R200 – reconstruction of earth transformers with inductors
Lovochemie, a.s.
ÚLV – complete supply of vertical pump
UNIPETROL RPA s.r.o.
R200 – replacement of station batteries
DITHERM a.s. (Synthos Kralupy, a.s.)
Reconstruction of computation technology halls
UNIPETROL RPA s.r.o.
Supplementation of source state in TS5833 and TS6419 – HR6
Chemoprojekt, a.s.
Design work – ORICA Trident / Australia
MERO a.s.
Roofing KZ at PC28 Nové Město: electric part
2008-2009
2008-2009
2009-2010
2010
2010
2010
2010
2011
2011
2012
Nelahozeves
2011-2012
2012
2012
2012
2012
2013
2012-2013
2012-2013
Mines
Severočeské doly a.s., Nástup Tušimice Mines
Reconstruction of 110kV substation (stage I)etapa)
Severočeské doly a.s., Nástup Tušimice Mines
Electric installation work – conveyor transport
Severočeské doly a.s., Nástup Tušimice Mines
Electric installation work – KU 300
Severočeské doly a.s., Bílina Mines
Reconstruction of 110kV substation
Severočeské doly a.s., Nástup Tušimice Mines
Reconstruction of 110kV substation (stage II)etapa)
První elektro a.s.
TR II – Nástup Tušimice Mines: reconstruction R110
První elektro a.s.
Overhaul of KU 300/29 : Nástup Tušimice Mines
2000
2000
2000
2001-2003
2001
2003-2004
2003
6
První elektro a.s.
Overhaul of KU 300/26 : MUS, a.s. – ČSA Mine
MUS, a.s.
Reconstruction of LV substation in building 2355 / ČSA Mine
2004
2004
MUS, a.s.
2004
Replacement of voltage controllers at 110 / 35kV transformers: ČSA Mine
Severočeské doly a.s., Bílina Mines
2005
Reconstruction TR1 – transfer of control to PC
MUS a.s.
2005
R35 HERKULES – Reconstruction of 35kV substation
Severočeské doly a.s., Bílina Mines
2008
Reconstruction of TR3 – Project Documentation
Severočeské doly a.s., Bílina Mines
2008
Modernization of TR211 – DNT substation
SD – 1.strojírenská, a.s.
2008
TR1 - reconstruction of 35kV substation: stage 2
PRODECO, a.s.
2008
SD - 35kV line relay: V12 to DNT
MUS a.s.
2008
R110 Líšnice – replacement of KMT in transformer bays
Severočeské doly a.s., Bílina Mines
2009
Reconstruction of HV substations for conveyor transport SOUTH
Severočeské doly a.s., Bílina Mines
2009
Reconstruction of protections for VSS – project documentation
SD – 1.strojírenská, a.s.
2009
TR1 - reconstruction of 35kV substation: stage 3
Severočeské doly a.s., Bílina Mines
2009
Reconstruction of Protections for VSS
Czech Coal Services, a.s.
2009
R110 Líšnice – replacement of KMT in the line bays
Czech Coal Services, a.s.
2009
R6 Raking Device – reconstruction of HV substations
Czech Coal Services, a.s.
2009
R6 ČSA – reconstruction of HV, LV distribution systems
SD – 1.strojírenská, a.s.
2010
TR1 - reconstruction of 35kV substation: stage 4
SD – 1.strojírenská, a.s.
2010
Test room – reconstruction of 4 bays of HV substation
Severočeské doly a.s., doly Bílina
2008-2011
Reconstruction of TR3 transformer station
Palivový kombinát Ústí nad Labem, s.p.
2010
Change of power supply to wall technology factory building and waste water treatment
plant
PRODECO, a.s. (Severočeské doly a.s., Bílina Mines)
2010-2011
Construction of wheel excavator KK1300: electric part and control and management
system
PRODECO, a.s. (Severočeské doly a.s., Bílina Mines)
2010-2011
Construction of new long-haul DPD B=1600 mm V1, V2, V3 conveyor line
Coal Services, a.s.
2010-2011
R110 Líšnice – replacement of VHV glands in transformer bays
Severočeské doly a.s., Bílina Mines
2011
TR ÚUL - remote breaking of 500V outlets
Severočeské doly a.s., Bílina Mines
2011
Renewal of visualisation equipment in ÚUL central control room
PRODECO, a.s. (Severočeské doly a.s., DNT)
2011
7
Construction of transformer station DT 35/6kV for power supply to 3.SŘ (DT64)
Severočeské doly a.s., DNT
2011
6kV cable route for spreader and removing conveyors, Libouš Quarry
SD – 1.strojírenská, a.s.
2011
Reconstruction of substation for Main Pumping Station II
NOEN, a.s.
2011
BD coal supply system ADULARIA - Yunus Emre 2x145MWe, Turkey
Elektroprim Koutník, a.s. (Severočeské doly a.s., Bílina Mines)
2011-2012
Construction of four DT 35/6kV transformer stations for Northern Slopes (TS77, 78, 79,
80)
Coal Services, a.s.
2011
R35 Líšnice – replacement of HV 35kV breaker
Severočeské doly a.s., Bílina Mines
2011
Modernization of visualisation and CS at ZP 10000/Z81L
Severočeské doly a.s., Bílina Mines
2011
Modernization of visualisation and CS at ZP 5500.5/Z79
Severočeské doly a.s., Bílina Mines
2011
Repair of inclinometer and evaluation unit at Z79 spreader
PRODECO, a.s. (Severočeské doly a.s., Bílina Mines)
2012
Excavator KK1300 – adding impact antenna
Elektroprim Koutník, a.s. (Severočeské doly a.s., Bílina Mines)
2012
Supply of control system for TV300 transport vehicle
PRODECO, a.s. (Severočeské doly a.s., Bílina Mines)
20112012
Reassembly of long-haul conveyor 1200a 1600 mm on Southern Slopes DB - construction
project B
Coal Services, a.s.
2012
Replacement of 35kV substation - Kopisty
SIEMENS s.r.o. (Severočeské doly a.s., Bílina Mines)
2012
Construction of two PD172, PD174 substations
Severočeské doly a.s., Bílina Mines
2012
Reconstruction of 500V bays at DKU, HD and HT – CS part
Severočeské doly a.s., DNT
2012
Modernization of DAP tensometric equipment on stripping excavators
Severočeské doly a.s., Bílina Mines
2012
Reconstruction of protections at DT75, DT76 transformer stations
Severočeské doly a.s., DNT
2012
Reinforcement of pumping equipment ČS 3/7 Libouš – south instrument transformer
Severočeské doly a.s., Bílina Mines
2012
Repair of dashboard PC in K98 machine cabin
Severočeské doly a.s., Bílina Mines
2012
Repair of readout of caterpillar turning at K101 machine
Severočeské doly a.s., DNT
2012
Digger K800/N2 – K104 : Lift and turn modernisation
Coal Services, a.s.
2012
Signalling of HV switching stations into information system
Coal Services, a.s.
2012
Monitoring of 35kV Herkules switching station
Elektroprim Koutník, a.s. (Severočeské doly a.s., Bílina mines)
2012-2013
Construction of six PD substations for Northern Slopes (PD921 to PD926)
Severočeské doly a.s., DNT
2012-2013
Construction of new coal outlet 3 - Tušimice
ARKO TECHNOLOGY, a.s. (Severočeské doly a.s., Bílina mines)
2012-2013
Extension of existing Emerán mine water purification works – electrical part, I + C and
control system
Severočeské doly a.s., DNT
2012-2013
8
Modernisation and refit of belt conveyor PD 275, PÚ Lom - UO II
Severočeské doly a.s., Bílina Mines
Inspection and repair of CS communication network on Z102 spreader
SIEMENS s.r.o. (Severočeské doly a.s., Bílina Mines)
PD502 and 506 commissioning – 2nd overburden cut
PRODECO, a.s. (Severočeské doly a.s., Bílina Mines)
Preparing RPD for CS and PVZ2500P controlled drives for DB
SIEMENS s.r.o. (Severočeské doly a.s., Bílina Mines)
Including SICK weigher in the control system
První Elektro, a.s. (Severočeské doly a.s., Bílina Mines)
K650/K108 control system modification
2013
2013
2013
2013
2013
Other industries
Škoda Auto a.s. Mladá Boleslav
1999-2000
Reconstruction of 110kV substation
Rükl a syn – Otvovice
1999
Reconstruction of glass melting tank - realization of electric part
Schaeffler GmbH – Bor u Tachova
2000
22kV substation construction
Factory building Schaeffler GmbH – Bor u Tachova
2000
Wiring
Schoeller Litvínov k.s.
2000
22kV substation
Velveta a.s., Varnsdorf
2000
Reconstruction of 35kV substation
Ústav jaderného výzkumu Řež u Prahy
2000
Reconstruction of 22kV distribution systems
Crystalex a.s Hostomice – Teplotechna Prima s.r.o.
2001
Reconstruction of factory building
Škoda Auto a.s. Mladá Boleslav
2001
Reconstruction of 22kV substation
Škoda Auto a.s. Mladá Boleslav
2001
Repair of LV and HV distribution systems
Všebořice – Škoda Auto a.s. Mladá Boleslav
2001
Reconstruction of 22kV transformer station
Škoda Auto a.s. Mladá Boleslav
2002-2004
R110 / E25: replacement of disconnectors
M. Ward Manufacturing, s.r.o.
2002-2003
22kV service line and 22/0.4kV transformer plant
STONE s.r.o.
2003
Reconstruction of TR 35/0.4kV incl. LV part
KAJIMA EUROPE B.V.
2003
SUMIKEI Czech New Factory – electric part
ALCES s.r.o.
2003
Reconstruction of ČTK building (Opletalova 5-7): electric part, LV, HV substation
CELIO a.s.
2003
Construction and connecting of cogeneration units
VA TECH WABAG s.r.o.
2003-2004
Reconstruction of chemical water treatment plant at TKY: electric part, M&R and system of
controlling of technology processes
ŠKO-ENERGO s.r.o.
2003
Replacement of cables for T6 – T12, 22kV transformers
ŠKODA AUTO a.s.
2003-2004
Reconstruction of 22kV substations: E25, M12B, M3 and M10
ŠKO-ENERGO s.r.o.
2003-2004
9
Switchover of HV 22kV, R22 / M6 and R22 / Z52 substations
ŠKO-ENERGO s.r.o.
Replacement of connecting cables of E25-R22 / STE (ROBO) substation
TESYCO GROUP a.s.
Reconstruction of 22kV substation: E25 in Škoda Auto, a.s.
Alcan Děčín Extrusions s.r.o.
Repair of fire safety system on cable distribution system
ŠKO-ENERGO s.r.o.
Replacement of 6kV substation: E14
GLAVERBEL CZECH a.s.
R35 – replacement of protections, signalling of earth connection
2003-2004
2004-2005
2005
2005
2005
Procter Gamble s.r.o.
2005
Supply and assembly of HV compensation switchgear
SORG GmbH
2006
KNAUF Krupka – glasswork melting unit: electric part
AQUA-STYL a.s.
2006
ŠKO-ENERGO Heating Plant / Unit 90 – installation of frequency converter in condensate
pump
ŠKO-ENERGO s.r.o.
2006
Replacement of 22kV switchgear: E14
EMCOS s.r.o.
2006
AGC Chudeřice / R14 substation - connecting NCx plant
ALCAN Děčín EXTRUSIONS s.r.o.
2006
Transformer station B – replacement of the main 500 V switchgear
Měď Povrly a.s.
2006
Foundry – 22kV supply, installation of shop floor technology
TESYCO GROUP a.s.
2006
Reconstruction of 22kV substation: H2B ve ŠKODA AUTO, a.s.
ŠKODA AUTO a.s.
2006
Reconstruction of the distribution network protection 22kV (MICROSCADA) – stage Ietapa
AGC Automotive CZECH a.s.
2006-2007
Construction of glass-melting tank 35/ 0.4kV
AQUA-STYL a.s.
2007
ŠKO-ENERGO heating plant / unit 80 – addition of heating condensate pump
ALCAN Děčín EXTRUSIONS s.r.o.
2007
Transformer station C – replacement of the main 500 V switchgear
SD – 1.strojírenská, a.s.
2007
TR1 - reconstruction of 35kV substation: stage 1
Měď Povrly a.s.
2007
Kontilití JATAM – reconstruction of the control part of the line
ŠKODA AUTO a.s.
2007-2008
Reconstruction of the distribution network protection 22kV (MICROSCADA) – stage IIetapa
ŠKO-ENERGO s.r.o.
2008
Connection of 6kV compressors in E14
ALCAN Děčín EXTRUSIONS s.r.o.
2008
Relocation of transformer station A – 10kV, 500V, 400V
ŠKO-ENERGO s.r.o.
2008
Replacement of TK4 compressor switchgear in Building E14
DALKIA ČR a.s.
2009
OC Fórum: Power supply for cooling plant – electric part
ŠKO-ENERGO s.r.o.
2009
Replacement of Disconnectors 22kV – Josefův Mine, Bradlec
ŠKO-ENERGO s.r.o.
2009
E5 Building – connection of air dryers
TESYCO GROUP, a.s. (ŠKODA AUTO a.s.)
2010
10
M12B – replacement of cabling for TR1, TR2, TR3
ŠKO-ENERGO s.r.o.
2009
M12A Building – reconstruction of transformer stations
ŠKO-ENERGO s.r.o.
2008-2010
Z5 Building - reconstruction of LV and HV substations
ŠKODA AUTO a.s.
2010
Reconstruction of the distribution network protection 22kV (MICROSCADA) – stage
IIIetapa
ŠKODA AUTO a.s.
2010
Reconstruction of 22kV distribution network protection (MICROSCADA) – stage IV
ALCAN Děčín EXTRUSIONS s.r.o.
2010
Extending HV switchgear in transformer station D
Schneider Electric CZ s.r.o.
2010-2011
WTP Chánov - reconstruction of HV and LV substation
ŠKODA AUTO a.s.
2010-2011
Reconstruction of 22kV distribution network protection (MICROSCADA) – stage V
ALCAN Děčín EXTRUSIONS s.r.o.
2011
Replacement of surge arresters in 110kV substation
TESYCO GROUP, a.s. (ŠKODA AUTO a.s.)
2011-2012
M1, M2 – reconstruction of power supply to substations
ŠKO-ENERGO s.r.o.
2011
Z6 building – replacement of motor starters for pumps
ŠKODA AUTO a.s.
2011
Repair of M1C, M2C substation controls
ŠKODA AUTO a.s.
2011
Reconstruction of 22kV - E28 substation protections
ŠKODA AUTO a.s.
2011
Reconstruction of direct current sources in 22kV substations
MONDI Štětí a.s.
2011
Installation of heating cables on piping systems
ŠKO-ENERGO s.r.o.
2012
E14 Building – replacement of VO switchgear
Kolbenschmidt Czech Republic, a.s.
2012-2013
Transformer station 35/0.4kV – reconstruction of 35kV switching station
ŠKO-ENERGO s.r.o.
2013
M12A Building – change of T1 and T10 transformers
Constellium Extrusions Děčín s.r.o.
2013
Repair of r4-10kV switchgear in transformer station "C"
TESYCO GROUP, a.s. (ŠKODA AUTO a.s.)
2013
Česana premises / Packet 1.1 - 22kV switching substation
Export
Sklárna Rasko, Anopino (RUSKÁ FEDERACE)
Installation of HV, LV wiring
Frankenluk GmbH Messe München (SRN)
0.4kV substations – wiring installation
Frankenluk GmbH Bosch Stuttgart (SRN)
0.4kV substations – wiring installation
Frankenluk GmbH Bosch Bamberg (SRN)
0.4kV substations – wiring installation
Sklárna Rostov n/D (RUSKÁ FEDERACE)
Installation of HV, LV wiring
Frankenluk GmbH – Munich Airport (FRG)
2000
2000
2000
2001
2001-2002
2001-2002
11
Construction of substations for airport terminal 2
SIEMENS A.G.
BMW FIS München: installation of 22kV substations
TE4 – Ulaanbaatar / Mongolia
Reconstruction of fuel tipper B – electric part
TE4 – Ulaanbaatar / Mongolia
Reconstruction of fuel tipper A – electric part
ZAT, a.s.
TALKHA / Egypt - service work - CS Diamo SK
TE4 – Ulaanbaatar / Mongolia
TE4 Power Plant - service work on coal handling system CS
2003-2004
2009
2010
2011
2011-2012
Summary of orders currently in progress
ŠKODA PRAHA Invest s.r.o. (ČEZ, a.s.)
2009-2014
OB_33.3 – power outlet in Ledvice Power Plant
ABB s.r.o. (ČEZ, a.s.)
2010-2014
OB_34.4 – installation and supply work for Ledvice Power Plant
EGEM s.r.o. (ČEZ, a.s.)
2011-2013
OB_09.3 - power outlet and exterior substation for PPC Počerady
ABB s.r.o. (ČEZ, a.s.)
2011-2013
OB_09 - installation and supply work for PPC Počerady
KLEMENT, a.s.
2011-2013
OB_09 – wiring for desuplhurization technology in Ledvice Power Plant
KLEMENT, a.s.
2011-2013
OB 10.1 - internal management of power generation by-products in Ledvice Power Plant
KLEMENT, a.s.
2011-2013
OB 10.2 - external management of power generation by-products in Ledvice Power Plant
ČEPS, a.s.
2011-2014
TR Albrechtice – maintenance of power equipment
EGEM s.r.o. (ČEPS, a.s.)
2011-2015
TR Babylon - reconstruction of transformer station
Czech Republic - Czech Development Agency
2011-2013
Ulaanbaatar / TE4 Power Plant - reconstruction of chemical water treatment plant
ČEZ Distribuce a.s. – TR110 Babylon
2012-2014
Reconstruction of the transformer station
I&C ENERGO a.s. (ČEZ, a.s.)
2012-2013
OB_34.4 – assembly work for reverse osmosis
NOEN, a.s.
2012-2013
EPRU II, OB01 – coal handling: distribution board for temperature transducers
TAMERO INVEST s.r.o. (Synthos Kralupy, a.s.)
2012-2013
PC3 - power output and conversions of existing 110kV switching station
GENERI, s.r.o. (ČEZ, a.s.)
2012-2013
EPOČ – installation of electric heaters
ČEPS, a.s.
2013
TR Milín – repair of ADA01, ADA02 switches
Severočeské doly a.s., Bílina Mines
2013
Reading SM undercarriage position on Z92
SYNTHOS Kralupy, a.s.
2013
Thermal oxidation unit with heat regeneration (RTNV)
APEK Praha s.r.o. (United Energy a.s.)
2013
Modernization of lime transport – power current part
SWIETELSKY stavební s.r.o.
2013
12
OB9 – desulphurization: electric installation work on SO713 and SO714 in Prunéřov 2
Power Plant
Severočeské doly a.s., Bílina Mines
2013
K2000.1/K101 – reconstruction of regulated turning device drives
ŠKO-ENERGO s.r.o.
2013
Replacement of lighting in cable collectors
CELIO a.s.
2013
Control room management of sources (cogeneration units)
SPEL, a.s. (ČEZ, a.s.)
2013
OB10.2 / DPS32.15 – automated system of controling of technology processes: cabling
and installation work
United Energy a.s.
2013
R6KTII – replacement of emergency arc protection
ULIMEX s.r.o. (Měď Povrly a.s.)
2013
Modernization and reconstruction of technology of cup producing plant
KAREL HOLOUBEK – Trade Group a.s.
2013
Replacement of V3 and V5 disconnectors
ŠKO-ENERGO s.r.o.
2013
Replacement of coupling cables in M12A, V17A, Z5 substations
PRODECO, a.s. (Severočeské doly a.s., Bílina Mines)
2013
ÚUL – renewal of D8b crushing plant: electric part and automated system of controling of
technology processes
COFELY a.s. (ČEZ Distribuce a.s.)
2013
Liberec Heating Plant – unification of R10kV to R22kV (stage IV) Etapa)
Kolbenschmidt Czech Republic, a.s.
2013
Replacement of T3, 22/0.4kV transformer
ABB s.r.o. (UNIPETROL RPA s.r.o.)
2013
Modification of R100 Control Room for new panel
KLEMENT, a.s. (JOTUN CZ a.s.)
2013
Installation of production lines No. 8 and 9 – Trmice
Montáže Čakovice s.r.o. (ŠKODA AUTO a.s.)
2013
Replacement of HV power supply cables for Z5 station
ČKD PRAHA DIZ, a.s. (SYNTHOS Kralupy, a.s.)
2013
K1 boiler burners – electric installation work
CSE-CONTROLS, s.r.o. (MERO a.s.)
2013-2015
Replacement of CS on Družba Oil Pipeline and CTR MERO – electric part
UNIPETROL RPA s.r.o.
2013
Reconstruction of MR69 switchgear
TENEL ČR s.r.o.
2013
Bridge – supply and installation of HV cables between TG and R35kV
UNIPETROL RPA s.r.o.
2013
Supply and installation of frequency converters for unit 22
MERO a.s.
2013
PC28 Nové Město – reconstruction of RM3.1 and service distribution systems
HERKUL a.s. (Severočeské doly a.s., Bílina Mines)
2013-2014
ÚUL – loading of dust coal: building installation
CHARMONT s.r.o.
2013
OB10.2 – external management facility of power generation by-products in ELE: electric
heating systems
13
Electric maintenance
United Energy, a.s. (Komořany Heating Plant)
Comprehensive maintenance of electrical equipment of all voltage levels
ČEZ a.s., Ledvice Power Plant
Partial maintenance of electrical equipment of HV and VHV voltage levels
MERO ČR, a.s.
Expert maintenance and servicing of electrical equipment of LV, HV and VHV voltage levels
Cray Valley Czech, s.r.o.
Partial maintenance of electrical equipment of LV and HV voltage levels
HV, VHV and EHV servicing
Coal Services, a.s.
ČEZ, a.s. – hydroelectric power plants
ČEZ, a.s. – conventional power plants
Dopravní podnik města Chomutov
Dopravní podnik města Ústí nad Labem
Dopravní podnik měst Mostu a Litvínova
Energetické Opravny, a.s.
ELPAK, s.r.o.
HUMECO, a.s. Most
Chemické závody Sokolov a.s.
I&C Energo, a.s.
KSK Komořany, a.s.
Litvínovská Uhelná, a.s.
PARAMO, a.s. Pardubice
Sokolovská uhelná a.s. Sokolov
SEI-MONT, s.r.o.
Spolana a.s. Neratovice
Spolchemie a.s. Ústí nad Labem
14
ŠKO-ENERGO a.s. Mladá Boleslav
Teplárna Trmice, a.s.
UNITED ENERGY, a.s.
Železárny Podbrezová, a.s.
15

Podobné dokumenty

Výroba, přenos a distribuce elektrické energie

Výroba, přenos a distribuce elektrické energie Velveta a.s., Varnsdorf Rekonstrukce rozvodny 35 kV Ústav jaderného výzkumu Řež u Prahy Rekonstrukce rozvodů 22 kV Crystalex a.s Hostomice – Teplotechna Prima s.r.o. Rekonstrukce výrobní haly Škoda...

Více

Výroba, přenos a distribuce elektrické energie

Výroba, přenos a distribuce elektrické energie Elektroprim Koutník, a.s. (Severočeské doly a.s., doly Bílina) Dodávka řídicího systému pro transportní vůz TV300 PRODECO, a.s. (Severočeské doly a.s., doly Bílina) Remontáže DPD 1200a 1600 mm na J...

Více

Výroba, přenos a distribuce elektrické energie

Výroba, přenos a distribuce elektrické energie Backup supply for BIOETHANOL Trmice ČEZ a.s. – Dalešice Electric Power Plant

Více

Výroba, přenos a distribuce elektrické energie

Výroba, přenos a distribuce elektrické energie Generální oprava rozvoden R 110 kV v oblasti RD sever z ED STE VE Štěchovice – ČEZ, a.s. Rekonstrukce elektrozařízení VN, NN po povodních TR Chotějovice – SČE, a.s. Automatiky ladění tlumivek SČE, ...

Více

Návod k obsluze 225

Návod k obsluze 225 INTRODUCTION Thank you for selecting and purchasing the Cardinal Model 225 Weight Indicator. The Model 225 indicator was built with quality and reliability at our factory in Webb City, Missouri an...

Více

SIEMENS Výrobce hliníkových vlakových souprav

SIEMENS Výrobce hliníkových vlakových souprav has to charge the legal VAT. This VAT amount cannot be refunded. Foreign buyers  from countries not belonging to the European Community have to pay the legal VAT as deposit to the auctioneer. After...

Více

SIEMENS Manufacturer of Aluminium Train Bodies

SIEMENS Manufacturer of Aluminium Train Bodies Dismantling is mandatory for several lots and will be done by Intermedia Engineering BV. The dismantling costs will be invoiced by Troostwijk Auctions together with your purchase. In these costs ar...

Více

Projekt diplomové práce

Projekt diplomové práce Taylor, L.T. (2006). Does WoW change everything?. Games and culture,2/4 38337 Williams, D. a kol. (2006). From tree houses to baracks. The Social life of guilds in World of Warcraft. Games and cult...

Více

referenze Media Media dal 2005 al 2010.xlsx - EL

referenze Media Media dal 2005 al 2010.xlsx - EL Balfour Beatty Rail S.p.A. ASM Voghera S.p.A. RINGIMILL S.p.A. RINGIMILL S.p.A. ABB S.p.A. Fenice S.p.A. Enel Produzione S.p.A. Elettrolumen S.r.l. Cefla S.c.r.l. Cefla S.c.r.l. Bridi Marino

Více