katalog staveb EN.indd
Transkript
RAILWAY BRIDGE in km 52.083 on track Beroun - Zbiroh Central Bohemia region Investor: Správa železniční dopravní cesty, state organisation Dlážděná 1003/7 110 00 Praha 1, Nové Město Total construction costs: CZK 66,950,497 Share of Viamont DSP in the implementation: 70% Construction period: 06/2009 – 08/2010 STRUČNÁ ANOTACE STAVBY: The rebuilding of the two-rail bridge on the Beroun – Zbiroh track involved the replacement of two steel trussed supporting structures from 1987, (plain sections with upper element bridge deck) with new solid steel structures intertwined with a reinforced concrete rail bed channel. Part of the reconstruction was the Pilsen support extension, rebuilding of the upper sections of both supports and repair of the preserved existing masonry of the substructure. The bridge reconstruction was executed in two phases. The new supporting structure is a solid steel double-beam structure with primary beams of varying height (parabolically curved bottom strips), intertwined with a reinforced concrete rail bed channel – one plain section below each rail. Primary beams spanning 38 m have such geometrical layout as the trussed parallel right-angle systems of theoretical height 4.20 m. Free height under the bridge is approx. 12 m. The supporting structure is sitting on four pot bearings per structure. The bridge support extension and adjustment is made of reinforced concrete. Full-cover insulation of smelted strips with a hard protective layer was used. The bridge is fitted with an angle railing and poles L80 x 10 with handrails L70 x 6. Viamont DSP a.s. Železničářská čp. 1385 CZ - 400 03, Ústí nad Labem Phone: +420 - 475 300 111 Fax: +420 - 475 300 100 http: www.viamontdsp.cz E-mail: [email protected]
Podobné dokumenty
chopper 411 - STRABAG Rail
o poloměru R ´75 až 129 m rychlostí nejvíce 10 km/h; oblouky o větším poloměru může vůz projíždět nejvyšší dovolenou rychlostí. Všeobecné informace: Vozy Chopperdozátor typu Vb 411 jsou samovýsypné...
VíceOPTIMÁLNÍ SVĚTELNÉ ŘEŠENÍ ELEKTRO
Přestože je LED technologie relativně mladá, téměř každý uživatel o ní uvažuje, a to z důvodu vidiny vysokých úspor elektrické energie. O reálných možnostech použití LED svítidel ve veřejném osvětl...
VíceGlass and prem. metal render a special touch to the interior design.
Stainless steel 70.11.0400
VíceProjekt Diakol - Návrh projektu - Centrum dopravního výzkumu, vvi
1.12. Cíle řešení projektu v původním jazyce projektu Cíle řešení projektu v původním jazyce projektu
Vícew ood - Umakov.cz
WB/21x7-D50-L2000 WB/21x7-D50-L2500 WB/21x7-D50-L3000 WB/21x7-Atyp 50 WD/21x7-D50-L2000 50 WD/21x7-D50-L2500 50 WD/21x7-D50-L3000 WD/21x7-Atyp
Více