Westinghouse and the AP1000 ® Westinghouse and the AP1000 ®
Transkript
Westinghouse and the AP1000 ® Westinghouse and the AP1000 ®
Westinghouse Non-Proprietary Class 3 © 2010 Westinghouse Electric Company LLC. All Rights Reserved. Westinghouse and the AP1000 ® Offering Great Opportunity for the Czech Republic Aziz Dag Vice-President, Vice President Marketing & Sales Westinghouse - Europe, Middle East & Africa Region Tim Drouin Director, Supply Chain Management g – Nuclear Power Plants Westinghouse Ostrava Machinery Conference: 20-21 April 2011 1 Westinghouse g is the Only y Company p y Solely y Focused on Commercial Nuclear Technology Nearly y 50 percent p of the nuclear p power p plants in operation p worldwide, and nearly 60 percent in the United States, are based on Westinghouse technology ● Th The AP1000 iis th the ttechnology h l off choice h i ffor more th than h half lf off th the new plants l t identified in the U.S. ● The only certified Generation III+ technology by the US Nuclear Regulatory C Commission i i (NRC) ● First Generation III+ plants under construction in China and US 2 Our Business Today: F Four P d t Lines Product Li – Regionally R i ll D Delivered li d Nuclear Services Nuclear Power Plants Focused on operating plant success through reliable operation, maximized power p and better (shorter, ( , output more predictable) outages Specializing in the technology of new nuclear power plants and component manufacturing Nuclear Fuel A single-source fuel provider for PWR, BWR, VVER, AGR and Magnox reactors worldwide Nuclear Automation Instrumentation and control systems to enhance the reliability of nuclear plant y systems y control and safety 3 Potential Westinghouse Projects Span the Globe 4 AP1000® International Projects China projects are under construction and on-schedule for 2013 ● Four AP1000 Nuclear Power Plants are currently under construction ¾ 2 Units in Sanmen, Zhejiang Province ¾ 2 Units in Haiyang, Shandong g Province ● First two units operational in 2013 and 2014 First unit at Sanmen is on-schedule for 2013 5 AP1000 International Projects The first four AP1000 U.S. units are under construction Six AP1000 units under contract - the first nuclear plant contracts in the U.S. in 30 years. Eight additional AP1000 units planned 14 Combined Construction and Operating License applications submitted to the U.S. NRC using AP1000 Bellefonte Tennessee Valley Authority 2 AP1000s Harris – Progress E Energy 2 AP1000s WS Lee – Duke Energy 2 AP1000s VC Summer – SCE&G/Santee Cooper 2 AP100s Vogtle – Southern Co 2 AP1000s South Texas Project 2 Toshiba ABWRs Turkey Point FPL 2 AP1000s Levy County Progress Energy 2 AP1000s 6 The Pillars of the Nuclear Renaissance AP1000 answers stakeholder needs for new-build onom mic Eco Resp ponsib bility In nheren nt Safety S y E Energ y Securitty The Nuclear Renaissance Reduction of risk forms the foundation of all three pillars 7 7 AP1000: Designed for Greater Certainty Built on the pillars of the nuclear renaissance • • • • Passive Safety utilizes natural forces such as gravity-gravity results in less material, maintenance and operation costs • No need for operator action for at least 72 hours • No need for external power or external supplies of cooling water Modular design drives faster, predictable construction schedule NRC-licensed NRC li dd design i reduces d licensing risk 1,100 MWe easily supports existing grid infrastructure Result: ¾ Greater Levels of Safety and Quality ¾Reduced Construction Time, Greater Schedule Certainty, and Lower Costs 8 AP1000: Designed for Greater Certainty How AP1000 Reduces Project Risk 9 AP1000: Designed for Greater Certainty Simplification Means the Smallest Nuclear Footprint E l ti Evolutionary PWR AP1000 AP1000 *Colors represent the 4 independent safety trains 10 AP1000: A Renaissance in Plant Design Less Equipment, Less Maintenance, and Less Risk 70% of AP1000 components are non-safety related 11 T pical Project Socio Typical Socio-Economic Economic Impact Project Construction Staffing - Including Module Fabrication 2500 Eq q Pers 2000 1500 Unit 2 Unit 1 1000 Site Devel & Modules 500 73 67 61 55 49 43 37 31 25 19 13 7 1 0 Months Up to 2,000 direct jobs with additional ripple-effect to economy 12 Westinghouse Non-Proprietary Class 3 © 2010 Westinghouse Electric Company LLC. All Rights Reserved. S ppl Chain Management Supply Tim Drouin 13 S ppl Chain Vision / Goals Supply Supply Base as a partner with Westinghouse in th AP1000 Integrated the I t t d Global Gl b l Supply S l Chain Ch i network t k •Safety •Nuclear Nuclear •Personnel •Quality Quality •Optimization of Cost & Delivery •Lowest Lowest landed cost •Schedule Certainty •Standardization Standardization 14 © 2010 Westinghouse Electric Company LLC. All Rights Reserved. SCM Organization Integrated S Supply l Ch Chain i NPP SCM Vice President Demand Planning & Business Development Plan Primary Equipment Program & Sourcing Auxiliary / BOP Equipment Program & Sourcing Source I&C Programs & Engineering Make Transportation & Logistics Deliver 15 WEC Supplier Expectations ● ● ● ● ● ● ● ● ● ● An unwavering commitment to quality and safety Value the prevention of errors Own and proactively solve problems Aggressive gg ess e a and dp predictable ed c ab e in terms e so of de delivery ey Able and willing to share in the risk for future business as demand grows Utilize lessons learned for continuous improvement Teamwork Optimization of Cost & Delivery - Lowest landed cost Schedule Attainment Make local suppliers competitive 16 Supply Chain Development is Critical Westinghouse thinks “global” but acts “local” z Buy Where We Build Build™ localized supply chain approach to projects z Use currentlyy available local/regional g suppliers consistent with the fleet build-out schedule z Develop upgraded documentation documentation, training and skills needed in partnership with the local regulator/government z Expand capabilities consistent with market growth, both locally and across Westinghouse global projects This approach will be used in the Czech Republic for European projects such as those in the United Kingdom 17 A Substantial Role for Czech Industryy For Czech, European, and Global Projects Westinghouse understands that Czech industry provides a strong base for manufacturing and supplying: ¾ Precision-machined components ¾ Instrumentation and control components ¾ Nuclear island p primary y components p Westinghouse is in the process of developing a number of Czech companies as major equipment suppliers for its global supply base. 18 Westinghouse g is Committed to Czech Industry y Building on an existing 20-year relationship Westinghouse has a long and rich historical relationship with Czech industry that dates to the completion of Temelin 1 and 2: ¾ I&C Energo, a.s. ¾ ZAT a.s. ¾ SKODA JS a.s. ¾ OSC, a.s. ¾ UJV Rez, a.s. ¾ Energovyzkum E k ¾ Vitkovice ¾ Energoproject Praha ¾ ARIS, a.s. ¾ ABEGU, a.s. ¾ Regula, a.s. ¾ SKODA Praha ¾ AFRAS Energo s.r.o. ¾ EGV Brno ¾ VUJE Trnava ¾ Skoda Power This experience provides an invaluable understanding of Czech capabilities and forms the foundation for today’s potential supply base 19 Westinghouse is Committed to Czech Industry ● Construction represents a large portion of any AP1000 project ● For over 12 months, Westinghouse has been engaged in an extensive in-country process of evaluating Czech constructors g is conducting g extensive on-site ● Westinghouse investigations and qualification reviews to evaluate Czech constructors This process is on-going 20 Typical AP1000 Cost Allocation By type and equipment breakdown Construction Mgmt 6% Proj Mgmt, Mgmt Engineering 6% Implicit p Localization E le c tr ic a l 5% P ip in g /V a lv e s 7% Site Construction 41% Equipment 43% Transportation/Other 4% C t Allocation Cost All ti H e a v y C o m p o n e n ts (T G , R V , S G ) 39% M e c h a n ic a l 38% I& C 11% Equipment breakdown 21 Examples of equipment required (Qty per reactor unit) Category Valves Pumps (non-RCP) Tanks Heat Exchangers Safety-related 700 Non-safety 4700 0 3 1 45 42 30 Fewer Nuclear grade (Safety-related) components provides more diversity within supply base 22 AP1000 Locali Localization ation Opport Opportunities nities ● NSSS & BOP Valves: ● Metallic Conduit ● Pumps & Compressors ● HVAC Duct ● Heat Exchangers & Condensers ● Air Handling Units, HVAC Fans ● Tanks & Accumulators ● Batteries ● Switchgear, MCCs, Panels ● Instruments ● Forgings F i ● Modules M d l ● NSSS Piping ● Concrete ● BOP Piping ● Rebar ● Cable ● Formwork ● Cable Tray ● Structural Steel Most Equipment and Commodities are non-safety class 23 Potential Scenario for Temelin Ti li Timeline of Purchase Order Placement fP h O d Pl t 24 *~2 years of development work before Major Equipment PO’s are placed SCM Portal – htt // https://supply.westinghousenuclear.com l ti h l 25 Supplier Identification Processes Business Development Fuels Sourcing Customers Services Logistics Demand Planning S Supplier li Symposiums S i I t Internet t Complete Supplier Evaluation Form WEC (Supplier Web site) Identify component /commodity/criteria Supplier Engineering (G (Global Supplier S Website)) Supplier Engineering Supplier Identification Determine top rank Safety Related 26 Sourcing Groups Validation Process Audit Selected Suppliers Qualified Supplier List (QSL) Sourcing Groups Action Plan to QSL/ASL Audit Team (Sourcing Lead, Lead Quality, Quality Supplier Engineering, Finance, Engineering, Project Delivery) Approved Supplier List (ASL) Non-Safety Non Safety S Supply Evaluation Process l E l ti P ASL Indoctrination NDA Signing / ASL Initial “Quality” Assessment Quote Preparation Quote Issuance Supplier Equipment Discussion Quote Review / Delivery Task Owner Process Drivers • Gaps • Capacity • Sole Source • Supplier Performance • Localization • FOAK • Strategic, MOU • Cost Reduction ASL / Supply Development (SD) ASL / Quality Sourcing Sourcing Sourcing / SD Sourcing, Engineering and Quality Inputs / Outputs ‐ Website ‐ Supplier Supplier Sympos ‐ Supplier Visits/VOC 27 ASL / SD / Supplier ‐ Supplier Register ‐ Signed NDA ‐ Sourcing Alignment ‐ Desk Top p Audit ‐ Quality Review ‐ Audit ‐ Meetings ‐ Generic T&C ‐ Quote Q Package ‐ Response Date ‐ Etc. ‐ Via E‐room ‐ Phone Calls Ph C ll ‐ VACPIC Input VACPIC I ‐ Visits ‐ VACPIC Output to Pricing ‐ Knowledge Sharing AP1000 Q lit A AP1000 Quality Assurance Program P ● Westinghouse QMS meets: Westinghouse QMS meets: – 10CFR50 App. B (USNRC) – NQA‐1, 1994 Edition NQA‐1 1994 Edition – ISO‐9001 ● Referenced in AP1000 Design Referenced in AP1000 Design Certification g ● Basis for current Westinghouse supply globally 28 Supplier Qualification Audit Process Select candidate supplier Issue audit plan and scope Supplier response / corrective actions On-site audit (using formal checklist) Issue formal audit report On-site verification of corrective actions Place Supplier on QSL 29 Westinghouse is Committed to Czech Industry Westinghouse will continue to develop Czech suppliers throughout the tender process. Commercial, “off-the-shelf,” non-safety components provide large opportunity for localization of AP1000 scope: ¾ More non non-safety safety class equipment inherent in the design ¾ Construction commodities ¾ All will be investigated later in the process as tender release approaches and sub contractor scopes are identified Potential commodity and non-safety commercial equipment suppliers will be evaluated consistent with the timescale of the tender 30 Summary ● Westinghouse projects are on-going on going and on-schedule on schedule in China and the United States ● AP1000 AP1000’s s reduction of risk directly supports the three pillars of the nuclear renaissance ● AP1000’s simplified p design g means less safety-related y equipment and greater ability to localize content ● Westinghouse has a successful 20-year history in Czech Republic ● Strong engagement and extensive work ongoing in Czech R Republic bli with ith major j equipment i t suppliers li and d constructors t t 31 First AP1000 in the World: Thank Th k you!! On Schedule for 2013. 32